長城杯在施部位作業要求
一、 頂板砼混凝土澆筑完成
1、 振搗:嚴禁用振搗棒攤平,必需用木耙或平鍬攤平;注意把握振搗時間,避免浮漿太多影響強度,進而引起板面開裂,尤其是墻,柱部位,浮漿過多給施工縫剔出石子帶來困難。
2、 澆筑前應拉通線檢查板筋的標高,以避免保護層過小或鋼筋外露或面層不平。
3、 刮平:用4m大杠刮平,同時必須拉線嚴格控制平整度;局部狹小或不易操作部位用2m杠刮平。必要時應沿板面拉線,控制板面平整度偏差在5mm以內。局部泌水集中部位平整度必不合格,應嚴格控制并掃除泌水。
4、 后澆帶施工縫處保護層:應重點控制該部位澆筑厚度,終凝前認真核查,找平,確保保護層為15mm。
二次搓面:注意抹子操作方向應統一。在距筒墻和柱邊150mm寬范圍內應使用大杠,嚴格檢
Great Wall Cup in facilities site operational requirements
First, the completion of concrete placement of concrete roof
1, vibration: prohibit the use of vibrating rod folded down, must rake or flat shovel with a wooden stalls level; pay attention to the vibration time, to avoid too much influence floating pulp strength, and subsequent board cracking, especially in the wall, column position, floating over to the construction joint ruled out pulp stones difficult.
2, before pouring Check Ligament-through line of elevation, to avoid the protective layer is too small or reinforcing bars, or uneven surface.
3 Calibrating: Calibrating with a 4m great bar, and must strictly control the smoothness of pull; local area with small or difficult to operate 2m bar evenness. Necessary, pull along board, control panel surface flatness deviation of less than 5mm. Local site smoothness bleeding focus will fail, and should be strictly controlled to eliminate bleeding.
4, after casting with a protective layer construction joints: we should focus on controlling the thickness of the parts of casting, check carefully before final setting, leveling, to ensure the protection layer is 15mm.
Second rubbing surface: note the direction of the trowel should be unified operation. In the side away from the cylinder walls and columns should be used within 150mm wide large bar, strict inspection