建設工程勘察合同.doc
進入下載頁
第一部分 協 議 書
發包人:_________________________________________
勘察人:_________________________________________
發包人委托勘察人承擔__________________________任務。
根據《中華人民共和國合同法》及國家有關法規規定,結合本工程的具體情況,為明確責任,協作配合,確保工程勘察質量,經發包人、勘察人協商一致,簽訂本合同,共同遵守。
第一條 工程概況
工程名稱:___________________________________________________________________________
工程建設地點:_______________________________________________________________________
工程規模、特征:_____________________________________________________________________
工程勘察任務委托文號、日期:__________________________________________________________
工程勘察任務(內容)與技術要求:_______________________________________________________
承接方式:___________________________________________________________________________
預計勘察工作量:____________________________________________________________________
工程內容:__________________________________________________________________________
第二條 發包人應及時向勘察人提供下列文件資料,并對其準確性、可靠性負責。
2.1提供本工程批準文件(復印件),以及用地(附紅線范圍)、施工、勘察許可等批件(復印件)。
2.2提供工程勘察任務委托書、技術要求和工作范圍的地形圖、建筑總平面布置圖。
2.3提供勘察工作范圍已有的技術資料及工程所需的坐標與標高資料。
2.4提供勘察工作范圍地下已有埋藏物的資料(如電力、電訊電纜、各種管道、人防設施、洞室等)及具體位置分布圖。
2.5發包人不能提供上述資料,由勘察人收集的,發包人需向勘察人支付相應費用。
第三條 勘察人向發包人提交勘察成果資料并對其質量負責。
勘察人負責向發包人提交勘察成果資料四份,發包人要求增加的份數另行收費。
第四條 開工及提交勘察成果資料的時間和收費標準及
The first part of the written agreement
Letting people :_________________________________________
Survey were :_________________________________________
The developer is the person who commissioned the survey __________________________ task.
According to "The People's Republic of China Contract Law" and the relevant state regulations, combined with the project specific conditions as a clear responsibility, coordination and cooperation, ensure survey quality, Jing letting party, survey, in consultation 一致, sign this contract, mutual respect.
The first project overview
Project Name :___________________________________________________________________________
Project Location :_______________________________________________________________________
Project size, feature :_____________________________________________________________________
Engineering Investigation task principal symbol, date :__________________________________________________________
Engineering Investigation task (content) and technical requirements :_______________________________________________________
Transition Methods :___________________________________________________________________________
Investigation is expected workload :____________________________________________________________________
Engineering content :__________________________________________________________________________
The second bidding should promptly provide the following documents to the survey data and its accuracy, reliability, responsibility.
2.1 provide the project approval document (copy), and the land (with the red line area), construction, licensing, inspection approval document (copy).
2.2 the provision of engineering survey for instructions, technical requirements and scope of the map, the total building floor plan.
2.3 The scope of survey work has been to provide technical information and engineering data required for the coordinates and elevation.
2.4 The scope of survey work to provide information on objects buried underground have (such as electricity, telecommunications cables, all kinds of pipes, air defense facilities, chambers, etc.) and specific location of distribution.
2.5-letting can not provide the above information, collected by a survey of people, the developer is required to pay the appropriate inspection fee.
Article submitted by the surveyor or survey results to the bidding information and responsible for the quality of their.
Investigation is responsible for the outcome of the bidding data submitted by survey, four, letting people be charged for additional number of copies.
Article IV started and the information submitted by survey results and the time and fees