《建設(shè)工程設(shè)計合同》-[專業(yè)建設(shè)工程設(shè)計合同].doc
進(jìn)入下載頁
GF-2000-0210
建設(shè)工程設(shè)計合同
[專業(yè)建設(shè)工程設(shè)計合同]
工程名稱:______________________________
工程地點:_______________________________
合同編號:______________________________
(由設(shè)計人編填)
設(shè)計證書等級:__________________________
發(fā)包人:________________________________
設(shè)計人:________________________________
簽訂日期:______________________________
中華人民共和國建設(shè)部
國家工商行政管理局
一九九九年十二月
第一部分 協(xié) 議 書
發(fā)包人:_________________________________________
設(shè)計人:_________________________________________
發(fā)包人委托設(shè)計人承擔(dān)__________________________工程設(shè)計,工程地點為__________________,
經(jīng)雙方協(xié)商一致,簽訂本合同,共同執(zhí)行。
第一條 本合同簽訂論據(jù)
1.1《中華人民共和國合同法》、《中華人民共和國建筑法》和《建設(shè)工程勘察設(shè)計市場管理規(guī)定》。
1.2國家及地方有關(guān)建設(shè)工程勘察設(shè)計管理法規(guī)和規(guī)章。
1.3建設(shè)工程批準(zhǔn)文件。
第二條 設(shè)計依據(jù)
2.1發(fā)包人給設(shè)計人的委托書或設(shè)計中標(biāo)文件
GF-2000-0210
Construction and Engineering Design Contract
[Professional construction and engineering design contract]
Project Title :______________________________
Project Location :_______________________________
Contract Number :______________________________
(Compiled by the designer fill in)
Design Certificate Level :__________________________
Letting people :________________________________
Designer :________________________________
Date signed :______________________________
The People's Republic of China Ministry of Construction
SAIC
December 1999
The first part of the written agreement
Letting people :_________________________________________
Designer :_________________________________________
The developer is the person who commissioned the design __________________________ engineering design, project location for the __________________,
Agreed by both parties signed this contract, joint implementation.
The first argument of this contract is signed
1.1 "Contract Law", "The People's Republic of China Construction Law" and "Construction Survey and Design market regulations."
1.2 State and local survey and design of the construction project management rules and regulations.
1.3 The construction approval document.
The second design basis
2.1 The developer is the power of attorney to the designer or design bid documents