建設工程施工合同條1.doc
進入下載頁
建設工程施工合同條件
第一章 詞語涵義及合同文件
第一條 詞語涵義。建設工程施工合同文本,由建設工程施工合同條件(以下簡稱合同條件)和建設工程施工合同協議條款(以下簡稱協議條款)組成。其用詞用語除協議條款另有約定外,應具有本條款所賦予的涵義:
1.發包方(簡稱甲方):協議條款約定的、具有發包主體資格和支付工程價款能力的當事人。
2.甲方駐工地代表(簡稱甲方代表):甲方在協議條款中指定的代表人。
3.承包方(簡稱乙方):協議條款約定的、具有承包主體資格并被發包方接受的當事人。
4.乙方駐工地代表(簡稱乙方代表):乙方在協議條款中指定的代表人。
5.社會監理:甲方委托具備法定資格的工程監理單位或人員對工程進行的監理。
6.總監理工程師:工程監理單位委派的監理總負責人。
7.設計單位:甲方委托的具備相應資質等級的設計單位。
8.工程造價管理部門:國務院各有關部門、各級建設行政主管部門或其授權的工程造價管理部門。
9.工程質量監督部門:國務院各有關部門、各級建設行政主管部門或其授權的工程質量監督機構。
10.工程:協議條款約定具體內容的永久工程。
12.合同價款:按有關規定或協議條款約定的各種收費標準計算的,用以支付乙方按照合同要求完成工程內容的價款總額。
Construction Contract Conditions
Chapter Meaning of words and the contract documents
The first words meaning. Building construction contracts, building construction by the terms of the contract (hereinafter referred to as contract terms), and the terms of Construction Contract (hereinafter referred to as terms of the agreement) form. In addition to the terms of its wording terms otherwise agreed, shall have the meaning ascribed to this article:
1. Contractee (Party): the terms of agreement, with the bidding price for the qualification and ability to pay the parties works.
2. Party on-site representatives (Party representative): Party in the terms specified in the proxy.
3. Contracting Party (B): the terms of agreement, the qualification was party contracting with contractors acceptable to the parties.
4. B on-site representatives (referred to as Party B on behalf of): B in terms of the agreement specified representative.
5. Community supervision: Party entrusted with the legal status of project supervision units or personnel for the supervision of the project.
6. The chief supervision engineer: engineering supervision unit assigned overall responsibility for supervision.
7. Designer: Party entrusted with the appropriate qualification level design unit.
8. Project Cost Management: The State Council departments, administrative departments at all levels of construction or the authorized project cost management.
9. Engineering quality supervision departments: the State Council departments, or administrative departments at all levels of construction projects authorized by the quality of oversight bodies.
10. Project: the terms of the specific content of the permanent works contract.
12. Contract price: According to relevant provisions of the agreement or the terms of the various fees calculated to cover the Party required to complete projects in accordance with the contents of the contract total price.