一、為適應(yīng)社會主義市場經(jīng)濟(jì)的發(fā)展和水利水電工程基本建設(shè)投資管理的需要,提高概(估)算編制質(zhì)量,合理確定工程投資,根據(jù)建筑安裝工程費用組成的有關(guān)規(guī)定,在水建[1998]15號文《水利水電工程設(shè)計概(估)算費用構(gòu)成及計算標(biāo)準(zhǔn)》的基礎(chǔ)上,并結(jié)合近些年水利水電工程自身行業(yè)特點,制定了本編制規(guī)定。它是編制和審批水利水電工程設(shè)計概(估)算的依據(jù),也是編制工程標(biāo)底的指導(dǎo)性標(biāo)準(zhǔn)。
二、本規(guī)定適用于中央項目和中央?yún)⑴c投資的地方大型水利水電工程。
三、工程的設(shè)計概(估)算應(yīng)按編制年的政策及價格水平進(jìn)行編制。若工程開工年份的設(shè)計方案及價格水平與初步設(shè)計概算有明顯變化時,則其初步設(shè)計概算應(yīng)重編報批。
四、本規(guī)定由水利部水利建設(shè)經(jīng)濟(jì)定額站負(fù)責(zé)管理與解釋。
1, for the development of socialist market economy and infrastructure investment management Hydropower Project needs to improve almost (estimated) budgeting quality, reasonably determine the project investment, construction and installation cost of the project according to the composition of the relevant provisions in the Waters [1998 ] article 15, "Water Resources and Hydropower Engineering Overview (estimated) expenses and the calculation of the standard calculation" based on combining its own in recent years Hydraulic Engineering industry characteristics, established the provisions of this preparation. It is the preparation and approval of Water Resources and Hydropower Engineering Overview (estimated) the basis for calculation, but also guiding the preparation of standard engineering bidding price.
Second, this provision applies to the central project and the central place to invest in large-scale participation of Water Resources and Hydropower Engineering.
Third, the project design takes (estimated) operator should be prepared in the preparation of policies and price levels. If the project start the design of the year and the price level and the preliminary design estimates are significant changes, then the budget should be re-compiled the preliminary design approval.
Fourth, the requirement by the Ministry of Water Resources is responsible for management of water conservancy construction and interpretation of economic Dinge Zhan.