        山東省安裝工程消耗量定額解釋
        第一冊(cè)機(jī)械設(shè)備安裝工程
         1.定額中未包括大型設(shè)備吊裝所用的施工機(jī)械費(fèi)用,請(qǐng)問什么樣的設(shè)備為大型設(shè)備?其所需的施工機(jī)械費(fèi)用如何計(jì)算?
            答:大型設(shè)備是指整體設(shè)備重量大于60噸的設(shè)備。本冊(cè)定額中未考慮大型設(shè)備的吊裝機(jī)具,發(fā)生時(shí)應(yīng)按施工方案另行計(jì)算。
            2.本冊(cè)中設(shè)備單機(jī)試運(yùn)轉(zhuǎn)包括的內(nèi)容是哪些?
            答:設(shè)備單機(jī)試運(yùn)轉(zhuǎn)屬于整體設(shè)備安裝內(nèi)容范疇。其工作內(nèi)容應(yīng)按相應(yīng)"規(guī)范"中規(guī)定的為準(zhǔn);不包括機(jī)械設(shè)備部分以外各系統(tǒng)(如電氣、儀表、通風(fēng)等系統(tǒng))的試驗(yàn)、調(diào)整、試運(yùn)轉(zhuǎn)。單機(jī)試運(yùn)轉(zhuǎn)所用的除水、電、氣、油、燃料需另計(jì)以外的其他材料、人工及機(jī)械均已包括在設(shè)備安裝定額內(nèi)。
            3.本冊(cè)定額中是否包括設(shè)備單機(jī)試運(yùn)轉(zhuǎn)時(shí)的配合電工?
            答:機(jī)械設(shè)備安裝定額內(nèi),已包括試運(yùn)轉(zhuǎn)中所必須配合的電工。機(jī)械設(shè)備的電氣部分的安裝、調(diào)整、試驗(yàn)、試運(yùn)轉(zhuǎn)所需的電工,則包括在相應(yīng)電氣安裝定額內(nèi)。
            4.設(shè)備本體范圍內(nèi)的管道及附件沒有隨設(shè)備配套供應(yīng),需現(xiàn)場(chǎng)進(jìn)行配制后安裝,應(yīng)怎樣計(jì)算該部分的制作安裝費(fèi)?
        Shandong Province to explain the installation of fixed consumption
        Volume installation of machinery and equipment
         1. Fixed equipment not included in large-scale construction machinery used for hoisting the cost, I ask what kind of equipment for large equipment? The construction equipment required for the calculation of the cost?
            A: The large-scale equipment is the equipment in the weight of more than 60 tons of equipment. This book is not considered large scale lifting equipment machinery, construction time of the program should be counted.
            2. The volume of equipment, including the contents of the single test run what?
            A: The equipment belongs to the whole installation commissioning single content area. The content of their work should be corresponding "standard" in the subject under; does not include machinery and equipment other than parts of systems (such as electrical, instrumentation, ventilation system) testing, adjustment, commissioning. Used stand-alone addition to commissioning of water, electricity, gas, oil, fuel, pay extra than other materials, labor and machinery are included in the fixed installation inside.
            3. Fixed in this book are included with the device when the stand-alone commissioning electrician?
            A: The installation of fixed machinery and equipment, which has been included in the commissioning electrician must meet. Electrical parts of machinery and equipment installation, adjustment, testing, commissioning the necessary electrical, are included within the corresponding fixed electrical installation.
            4. Body within the pipeline equipment and accessories not matching supply with the equipment, be installed after site preparation, how to calculate the part of the production installation fee?
         