地下室基坑支護工程.doc
進入下載頁
一、工程概況:
擬建的XX_大廈位于XX_。擬建場地原為XX_,場地地勢南高北低,場地東南方向有XX_,擬建物主樓XX_層,兩側辟樓XX_層,地下室XX_層,面積約XX_平方米。
場地周圍環境概況 第 1 頁 共 1 頁
二、場地周圍環境概況
擬建物東南側及西側均有已建房屋,且距離較近,擬建物軸線距東南側已建的XX_住宅樓間距僅XX_米,該已建六層樓北軸線基礎為柱下條形基礎,基礎外挑XX_米,基礎埋深約XX_米。
揚地西側為XX_住宅樓,擬建物軸線距離有建筑外墻8米,已有建筑物基礎情況不明。
1, Project Overview:
The proposed XX_ building located XX_. The proposed site was originally XX_, high and low-lying site, the venue southeast direction XX_, the proposed main building XX_ layer materials, provision of floor XX_ layer on both sides of the basement XX_ floor area of about XX_ square meters.
Venues around the environmental profile Page 1 of 1 page
Second, the venue environment overview
The proposed materials have been the southeast and the west side of building houses, and the close proximity of the axis from the southeast of the proposed property has been built XX_ residential floor space is only XX_ meters, the six floors has been built based on the column under the North axis Article form the basis fundamentals pick XX_ meters, based on depth of about XX_ meters.
Yang to the west side of the XX_ residential building, the proposed exterior wall material axis distance of 8 meters, the basis of existing buildings is unknown.
