目 錄
一、工程概況 2
二、場地工程地質水文地質條件 2
三、編制依據 3
四、鉆孔夯擴擠密樁復合地基設計方案 4
五 施工組織機構 5
六 施工人員計劃及施工工期 6
七 施工設備計劃 6
八 施工材料﹑水﹑電計劃 6
九、鉆孔夯擴擠密碎石樁施工過程簡介 6
十、夯擴擠密樁質量控制措施 7
十一、檢驗及試驗 9
十二、施工安全、消防與文明施工管理 9
CONTENTS
1, Engineering Overview 2
Second, site engineering geologic and hydrological and geological conditions of 2
Third, the preparation according to 3
4, drilling Compacted pile composite foundation design 4
5 5 Construction Organization
Six construction workers planning and construction period 6
7 plan 6, construction equipment
Eight construction materials, water, electricity plan 6
9, drilling Compacted gravel pile construction Introduction 6
10, Compacted 7 pile quality control measures
11, inspection and testing 9