某大廈工程靜壓預應力管樁施工方案.doc
進入下載頁
目 錄
一、工程概況及工作特點
二、地質簡況
三、施工工藝流程及施工方法
四、施工組織部署
1、人員配備及其職責(附圖1:施工工程管理架構圖)
2、主要設備配置
3、材料用量計劃
4、施工進度計劃(附圖2:施工進度計劃橫道圖)
5、施工順序(附圖3:樁機走向圖)
五、質量保證措施和工期保證措施
六、安全、文明施工措施
七、施工中可能遇到工程問題及處理建議
CONTENTS
1, Engineering Survey and work characteristics
Second, geological profiles
Third, the construction process and construction methods
4, construction organizations to deploy
1, staffing and functions (Figure 1: Construction project management structure chart)
2, the main device configuration
3, material usage plan
4, the construction progress of the plan (Plan 2: construction schedule bar chart)
5, the construction sequence (photo 3: Pile Driver to map)
5, quality assurance measures and schedule assurance measures
6, security, civil construction measures
7, construction and engineering problems may be encountered in dealing with the proposed