          旋挖鉆樁基施工方案
        一、 工程概況
         某分離式立交橋?yàn)殡p向雙幅四車道預(yù)應(yīng)力簡(jiǎn)支梁結(jié)構(gòu),起止樁號(hào)為K12+425.29~K13+090.71,共計(jì)665.42m,即從1#橋臺(tái)至34#橋臺(tái)共34跨。2002年9月業(yè)主對(duì)該橋進(jìn)行了一次重大設(shè)計(jì)變更,將34#橋臺(tái)至另一標(biāo)段1#橋臺(tái)段原設(shè)計(jì)的填土路基修改為高架橋,兩端之間增加40跨高架橋,橋梁總長(zhǎng)變更為74跨。下構(gòu)墩柱基礎(chǔ)為系梁,每半幅系梁基礎(chǔ)均為兩根直徑1500mm的鉆孔灌注樁,共計(jì)增加路改橋160根樁,樁基為25#砼,樁長(zhǎng)為26.8米。
        二、 施工前現(xiàn)場(chǎng)處理平面布置圖(見附圖1)   
        路改橋段設(shè)計(jì)修改前為填土路基,其原地面全為魚塘和低洼稻田,且正式設(shè)計(jì)修改前對(duì)路基范圍內(nèi)的7個(gè)魚塘已進(jìn)行了清淤換填砂卵石,換填高度超出地下水位接近施工便道的頂面,后業(yè)主方要求將已回填好的砂卵石約3萬(wàn)方全部挖出來(lái)運(yùn)到另一處作為回填材料,這樣該段設(shè)計(jì)路改橋后原地形又恢復(fù)為原來(lái)的7個(gè)魚塘和低洼地。進(jìn)行橋梁下構(gòu)施工前必須對(duì)場(chǎng)地進(jìn)行處理,考慮
        Pile Foundation Construction auger drill program
        First, project survey
         Overpass of a separate four-lane two-way dual-rate structure of prestressed beams, beginning and ending Stake for the K12 +425.29 ~ K13 +090.71, a total of 665.42m, from 1 # to 34 # bridge abutment with a total of 34 cross. September 2002 the owners of the bridge was a major design change, the abutment 34 # 1 # Bridge Lot to another section of the original design of the filling station was revised to elevated roadbed, an increase of 40 across the viaduct between the two ends of the bridge length changed to 74 cross. Under the pier base and beam structure, the basis of each Banfu tie beam are two 1500mm diameter bored piles for a total increase of 160 Road Reconstruction and Bridge piles, pile of 25 # concrete, pile length is 26.8 meters.
        Second, dealing with pre-construction site layout plan (see photo 1)
        Road Reconstruction and plot design changes before filling subgrade, the original low-lying ground whole fish ponds and rice fields, and the formal design changes before the foundation of seven ponds within the scope of the dredging has been carried sand and gravel replacement, replacement high Construction of pavement beyond the water table close to the top, after the owner asked to have a good sand backfill all excavated gravel Yue 3 of Lai Yun Daolingyichu Zuowei backfill material, Zhe Yang Road Gai bridge design of the paragraph after the restoration of the original topography You Wei The original seven fish ponds and low-lying land. Conducted under the bridge structure before construction on the venues deal, consider
         