一、承建本工程的總體目標(biāo)規(guī)劃
(一)工程質(zhì)量目標(biāo)
1、整體工程質(zhì)量遵守國(guó)家、建設(shè)部及原電力部、國(guó)家電力公司頒發(fā)的標(biāo)準(zhǔn)、規(guī)定,達(dá)到優(yōu)良等級(jí),確保創(chuàng)省優(yōu)質(zhì)工程。
2、建筑工程合格率100%,優(yōu)良率100%。
(二)施工工期目標(biāo)
1、總工期105天,較招標(biāo)文件工期要求提前15天。
2、如我方責(zé)任延誤工期時(shí),無(wú)條件接受項(xiàng)目法人按合同約定額度給予處罰。
(三)安全、文明施工及環(huán)保目標(biāo)
1、無(wú)重傷以上人身事故,杜絕重大機(jī)械、設(shè)備損壞事故,杜絕負(fù)主要責(zé)任的重大交通事故及其它重大事故;杜絕因管理不善而造成的機(jī)械設(shè)備、交通運(yùn)輸、爆炸、火災(zāi)、中毒等重大事故;千人負(fù)傷率控制在4‰以內(nèi)。
2、嚴(yán)格執(zhí)行ISO14000環(huán)境管理和職業(yè)安全衛(wèi)生管理體系,不發(fā)生環(huán)境污染事故。
3、文明施工樹樣板,創(chuàng)市級(jí)文明施工工地。
(四)其它目標(biāo)
1、按建筑法及建筑條例新規(guī)定執(zhí)行建筑工程保修期。
2、主動(dòng)與其它標(biāo)段相互配合、協(xié)調(diào)運(yùn)作,避免施工中的相互干擾帶影響施工。
3、積極處理好涉及地方的相關(guān)事宜,營(yíng)造和諧的施工環(huán)境,確保工程順利進(jìn)展。
二、工程概述
(一)工程規(guī)模及建址
新建鶴壁電廠三期工程建設(shè)規(guī)模為2×600MW火電機(jī)組,建址在河南省鶴壁市新風(fēng)路1號(hào),即在電廠二期工程
First, the construction of the project's overall objective programming
(A) of the project quality objectives
1, the overall quality of the project to comply with the national Ministry of Construction and the former Ministry of Electric Power, State Power Corporation issued standards, regulations, achieve good grades, to ensure high-quality engineering innovation province.
2, works 100% pass rate, good rate of 100%.
(B) of the construction period goal
1, the total duration of 105 days, compared with the duration of tender documents requested 15 days in advance.
2, such as our responsibility to delay the construction period, the unconditional acceptance of the legal person shall be punished according to the contract amount.
(C) security, civil construction and environmental goals
1, no serious injuries or more personal injury, to prevent a major machinery, equipment damage incidents, the primary responsibility to prevent major accidents and other major incidents; prevent mismanagement caused by mechanical equipment, transportation, explosion, fire, poisoning and other major accidents; thousands wounded rate control in less than 4 ‰.
2, strict implementation of the ISO14000 environmental management and occupational safety and health management system, environmental pollution accidents do not occur.
3, civilized construction tree model, the highest municipal civil construction sites.
(D) Other objectives
1, according to construction law and building regulations, construction of new provisions of the warranty period.
2, active mutual coordination with other tenders, co-ordination, to avoid interference with the construction of the impact of the construction.
3, actively involved in handling matters related to local and create a harmonious work environment, ensure smooth progress.
2, Project Description
(A) the size of the project and construction site
New Hebi Power Plant Phase III Project size 2 × 600MW thermal power units, construction sites in Henan Hebi City, Xinfeng Road 1, that is, in Power Plant