一、樁的設計要求
本工程采用預應力高強砼管樁,樁徑為Ф400,壁厚為90MM,砼C80,配筋AB型,共計105根。擬采用ZYJ-500液壓靜力壓樁,管樁要求單樁豎向承載力標準值為1200KN,樁長約20m左右,樁尖持力層為強風化花崗巖,樁的承載力以端承為主,沉樁控制以貫入度為主,樁長為輔。
ZYJ-500液壓靜力壓樁機技術參數:
壓樁力、壓樁速度
主壓樁缸單獨工作:壓樁力230TF,最大壓樁速度:2.8M/MIN
主副壓樁缸同時工作:壓樁力500.8TF,最小壓樁速度:0.8M/MIN
Statically Pipe Construction
A pile of design requirements
The project uses high-strength prestressed concrete piles, pile diameter Ф400, wall thickness of 90MM, concrete C80, reinforcement AB, a total of 105. To be adopted ZYJ-500 hydraulic static piling, pile load capacity required standard value 1200KN, about 20m long pile, the pile tip bearing stratum for the weathered granite, to end bearing capacity of pile based , pile driving control the penetration into the main pile length supplement.
ZYJ-500 Hydraulic Static Pile Driver Technical Data:
Piling capacity, piling speed
Master cylinder pressure piling work alone: Pressure piles force 230TF, the largest piling speed: 2.8M/MIN
Main and piling into the vat of work: pressure piling force 500.8TF, minimal piling speed: 0.8M/MIN