5.1 變形觀測的基準點、觀測點設定時間不當
1.現象
基準點、觀測點在支護結構和降水井施工未完成前或基坑開挖后設定,不能反映基坑邊坡的實際變形情況。
2.原因分析
(1)操作者未掌握基坑變形觀測知識。
(2)對沉降和水平位移觀測質量不重視。
(3)基準點、觀測點受支護結構、降水井和土方開挖施工的擾動。
3.防治措施
變形觀測所用的基準點、觀測點應在支護結構或降水井施工完成后,基坑開挖之前設定,使所觀測成果更能切合實際。
5.2 水平位移觀測點、沉降觀測點和基準點布設位置不當
1.現象
Deformation Monitoring of Deep Foundation
5.1 The deformation of the reference points, observation points set the time wrong
1. Phenomenon
Reference point, observation point in the support structure and precipitation well before the completion of construction or excavation, after setting, can not reflect the actual excavation slope deformation.
2. Analysis
(1) the operator does not grasp the foundation deformation of knowledge.
(2) of the settlement and horizontal displacement observation quality attention.
(3) reference point, observation point by the support structure, dewatering well, and Earth Excavation disturbance.
3. Control measures
Deformation of the reference point used, observation points should be in supporting structure or dewatering well construction is completed, set before the excavation so that the observed results more realistic.
5.2 horizontal displacement observation points, observation points and settlement layout is poorly located reference points