成年女人永久免费观看视频,国产黄片一区视频在线观看,国产日韩视频在线观看,国产一区二区三区色区,国产在线精品一区二区不卡麻豆,日韩黄色成人,国产日韩精品欧美一区视频,五月丁香欧美
        建虎網(wǎng) 節(jié)省時(shí)間成本,讓工作學(xué)習(xí)變得更高效!www.ad176.com

        箱涵模板施工技術(shù)交底.doc

        更新時(shí)間: 2024-02-23
        下載權(quán)限: 免費(fèi)會(huì)員
        文件大。 0.01 MB
        文件類型: .doc
        瀏覽次數(shù):
        上傳會(huì)員: 382957161
        所屬欄目: 巖土技術(shù)交底
        進(jìn)入下載頁(yè)
        資料簡(jiǎn)介

        交底內(nèi)容:
        1. 本工程采用木膠合板作模板,厚度為18mm,構(gòu)造尺寸為長(zhǎng)×寬=980mm×1800mm。
        2. 模板安裝前應(yīng)在模板表面涂抹脫模劑。
        3. 模板安裝前,必須經(jīng)過正確放樣,檢查無誤后才立模安裝。
        4. 模板必須支撐牢固、穩(wěn)定,無松動(dòng)、跑模、超標(biāo)準(zhǔn)的變形下沉等現(xiàn)象。模板拼縫平整嚴(yán)密,并采取措施填縫,保證不漏漿,模內(nèi)必須干凈。模板安裝后及時(shí)報(bào)驗(yàn)及澆混凝土。
        5. 側(cè)墻模板:
        (1).  側(cè)墻鋼筋綁扎完畢經(jīng)驗(yàn)收合格后,隨即清理其周圍雜物,為安裝模板作準(zhǔn)備。
        側(cè)墻模板由φ48鋼管立檔及木枋橫檔和φ48mm鋼管斜撐來支撐固定:先立100mm×100mm木枋橫檔@500mm,然后放φ48mm鋼管立檔@600mm。采用φ48×3.5mm鋼管斜撐固定內(nèi)側(cè)板,斜撐底部采用預(yù)埋鋼筋固定。另外,在基底兩側(cè)預(yù)埋φ48×3.5mm短鋼管,將側(cè)模豎向圍檁與預(yù)
        Cards on the table contents:
        1. This project uses wood plywood for templates, thickness 18mm, structure size length × width = 980mm × 1800mm.
        2. Template installed before release agent coated surface of the template.
        3. Template before installation, must be the correct setting out, check and correct before formwork installation.
        4. Template to support strong, stable, no loose, running mode, the deformation beyond the standard sink and so on. Template patchwork tight formation, and to take measures to sealing to ensure no leakage pulp, mold must be clean. Templates added after installation, and inspection and pouring concrete Times.
        5. Sidewall template:
        (1). Sidewall steel banding is completed after their acceptance, then clean up around the debris, in preparation for the installation of the template.
        Side wall of the template established by the φ48 pipe stalls and wooden stalls and φ48mm Fang Wang steel bracing to support fixed: first, Fang Li 100mm × 100mm wooden cross file @ 500mm, then let stand φ48mm steel file @ 600mm. Φ48 × 3.5mm steel tube with a fixed medial plate bracing, bracing the bottom of the use of embedded steel fixed. In addition, embedded in the substrate on both sides of the short pipe φ48 × 3.5mm, the vertical side mold and pre-Wai purlin
         

        下載地址

        前往下載