        鋼筋砼預(yù)制樁打樁工藝.doc

        更新時(shí)間: 2024-03-05
        下載權(quán)限: 免費(fèi)會(huì)員
        文件大小: 0.01 MB
        文件類(lèi)型: .doc
        瀏覽次數(shù):
        上傳會(huì)員: 龍龍
        所屬欄目: 巖土工藝工法
        進(jìn)入下載頁(yè)
        資料簡(jiǎn)介

        1. 范圍

        本工藝標(biāo)準(zhǔn)適用于工業(yè)與民用建筑中的打鋼筋混凝土預(yù)制樁工程。
        2.施工準(zhǔn)備
        2.1  材料及主要機(jī)具:
            2.1.1  預(yù)制鋼筋混凝土樁:規(guī)格質(zhì)量必須符合設(shè)計(jì)要求和施工規(guī)范的規(guī)定,并有出廠合格證。
            2.1.2  焊條(接樁用):型號(hào)、性能必須符合設(shè)計(jì)要求和有關(guān)標(biāo)準(zhǔn)的規(guī)定,一般宜用E4303牌號(hào)。
            2.1.3  鋼板(接樁用):材質(zhì)、規(guī)格符合設(shè)計(jì)要求,宜用低碳鋼。
            2.1.4  主要機(jī)具有:柴油打樁機(jī)、電焊機(jī)、樁帽、運(yùn)樁小車(chē)。索具、鋼絲繩、鋼墊板或槽鋼,以及木折尺等。
            2.2  作業(yè)條件:
            2.2.1  樁基的軸線和標(biāo)高均已測(cè)定完畢,并經(jīng)過(guò)檢查辦了預(yù)檢手續(xù)。樁基的軸線和高程的控制樁,應(yīng)設(shè)置在不受打樁影響的地點(diǎn),并應(yīng)妥善加以保護(hù)。
            2.2.2  處理完高空和地下的障礙物。如影響鄰近建筑物或構(gòu)筑物的使用或安全時(shí),應(yīng)會(huì)同有關(guān)單位采取有效措施,予以處理。
            2.2.3  根據(jù)軸線放出樁位線,用木橛或鋼筋頭釘好樁位,并用白灰作標(biāo)志,以便于施打。
            2.2.4  場(chǎng)地應(yīng)碾壓平整,排水暢通,保證樁機(jī)的移動(dòng)和穩(wěn)定垂直。
            2.2.5  打試驗(yàn)樁。施工前必須打試驗(yàn)樁,其數(shù)量木少于2根。確定貫入度并校驗(yàn)打樁設(shè)備、施工工藝以及技術(shù)措施是否適宜。
            2.2.6  要選擇和確定打樁機(jī)進(jìn)出路線和打樁順序,制定施工方案,作好技術(shù)交底。
        3.操作工藝
        3.1  工藝流程:
         就樁樁機(jī) → 起吊預(yù)制樁 → 穩(wěn)樁 → 打樁 → 接樁 → 送樁 → 

        中間檢查驗(yàn)收 → 移樁機(jī)至下一個(gè)樁位  

            3.2  就位樁機(jī):打樁機(jī)就位時(shí),應(yīng)對(duì)準(zhǔn)樁位,保證垂
        1. Range

        This technology is applicable to industrial and civil buildings in precast reinforced concrete piles to play.
        2. Construction preparation
        2.1 Materials and main equipment:
            
        2.1.1 precast reinforced concrete piles: specifications must meet the design requirements and construction specifications of requirements and a factory certification.
            
        2.1.2 electrode (the pile to use): model, performance must meet the design requirements and provisions of the relevant standards, generally it is appropriate to E4303 grades.
            
        2.1.3 plate (with the pile): materials, specifications, design requirements, it is appropriate low-carbon steel.
            
        2.1.4 The main machine has: Diesel hammer, welding machines, pile caps, pile car transport. Rigging, wire rope, steel plate or channel, and wooden folding ruler and so on.
            
        2.2 Operating conditions:
            
        2.2.1 pile axis and elevation have been measured and have been organized through the pre-inspection procedures. Pile axis and the elevation of the control pile, piling should be set without affecting the location, and should be protected properly.
            
        2.2.2 processed aerial and underground obstructions. Impact of adjacent buildings or structures such as the use or safety, in conjunction with the relevant authorities to take effective measures to deal with.
            
        2.2.3 Pile released under the axis line, with a wooden peg or a steel screw piles bit better, and with the white ash as an indicator for the injections.
            
        2.2.4 The site should be rolled flat, the drainage flow, to ensure stability of the vertical movement and pile driver.
            
        2.2.5 Test Piles play. Fight test piles before construction, the number of trees less than 2. Determine the penetration and check piling equipment, construction technology and technical measures are appropriate.
            
        2.2.6 To select and determine the line of hammers and piling out of the order of the construction project and make technical disclosure.
        3. Operation Process
        3.1 Process:
         
        The lifting of precast piles pile machine → → → stable pile the pile piling → → → jacked piles

        Intermediate examination and acceptance → Move to the next Pile Driver Pile

            
        3.2 in place pile driver: pile in place, the pile should be aligned position, to ensure vertical