新建鐵路重慶至懷化線土建工程施工方案.doc
進(jìn)入下載頁
新建鐵路重慶至懷化線土建工程第X標(biāo)段(DK363+073-DK381+000)全長26.055km范圍內(nèi)的改移道路、改河改溝、砍樹挖樹根、路基、橋涵、隧道、軌道(不含鋪軌、鋪岔、線路加強(qiáng)沉落整修)、房屋(不含電氣化生產(chǎn)房屋及其附屬工程)、其他運(yùn)營生產(chǎn)設(shè)備及建筑物(不含站區(qū)建筑綠化工程)、大型臨時(shí)設(shè)施、土建工程引起的過渡工程。不包括路基及隧道巖溶壓漿整治工程。
New railway line in Chongqing to Huaihua X Civil Works Lot (DK363 +073- DK381 +000) within the full 26.055km road diversion, change river changed ditch, cutting trees dug roots, subgrade, bridges, tunnels, rail (excluding track-laying and laying turnout, line enhancing sink repair), housing (excluding housing and ancillary works electric production), other operating production equipment and buildings (excluding station building greening project area), large-scale temporary installations, civil works project due to the transition project. Does not include foundation training works and tunnel grouting Karst.
