        箱梁施工作業指導書

        針對當前我后張箱梁即將開工之即的各種施工情況,為了控制梁體在預制前后,內在、外在質量能夠達到業主的高標準要求。現對箱梁施工隊伍技術負責人員就各具體施工環節作如下的作業指導:
        一、指導范圍
        該作業指導書包括后張法20m箱梁的施工、吊運及存放。
        二、相關的技術規范
        (1)XX高速公路《兩階段施工圖設計》
        (2)《公路工程國內招標文件范本》
        (3)GB1489-98《鋼筋砼及熱軋帶肋鋼筋》
        (4)GB13013-91《鋼筋砼及熱軋光圓鋼筋》
        (5)JTJ041-2000《公路橋涵施工技術規程》
        三、各階段指導內容
        1、非預應力鋼筋的制做、成型、綁扎
        (1)與圖核對成品鋼筋的鋼號、直徑、形狀、規格尺寸和數量是否正確無誤,如有遺漏,應及時糾正、增補,并及時與現場技術負責人取得溝通后方可開始制作。
        (2)鋼筋的制做為使其在加工成型后滿足規范,應針對圖紙設計型號、類別分專人專項加工制作。制作時:
        a、鋼筋的表面應潔凈,使用前應將表面油漬、漆皮、鱗銹等清除干凈。
        b、鋼筋應平直,無局部彎折,成盤的鋼筋
        Box girder work instructions

        Post-tensioned box girder for the current I that is all about to start the construction of the body to control the beam before and after the prefabricated, internal and external quality of the owners to achieve high standards. Technical teams are on the box girder for construction of staff on specific aspects of the operation guidance as follows:
        A guide scope
        The work instructions include 20m post-tensioned box girder construction, lifting and storage.
        Second, related technical specifications
        (1) XX Highway, "two-stage construction design"
        (2) "Highway project template domestic tender documents"
        (3) GB1489-98 "reinforced concrete and hot rolled ribbed"
        (4) GB13013-91 "reinforced concrete and hot rolled round bar"
        (5) JTJ041-2000 "in Bridge Construction" Technical Specification
        Third, the contents of each stage guide
        1, making non-prestressed reinforcement, molding, banding
        (1) finished with the map check the steel reinforcement, diameter, shape, size and quantity specifications are correct and, if missed, should be promptly corrected, updated and timely access and on-site person in charge of communication technology may commence only after production.
        (2) reinforcement of the system as to meet the specifications after the molding process should be designed for drawing models, a special category of hand manufacture. Production Time:
        a, steel surfaces should be clean, grease the surface before use should, patent leather, scale rust, etc. cleaned.
        b, bar should be straight, no local bending into a plate of steel
         