成年女人永久免费观看视频,国产黄片一区视频在线观看,国产日韩视频在线观看,国产一区二区三区色区,国产在线精品一区二区不卡麻豆,日韩黄色成人,国产日韩精品欧美一区视频,五月丁香欧美
        建虎網 節省時間成本,讓工作學習變得更高效!www.ad176.com

        先張法預應力板梁施工作業指導書.doc

        更新時間: 2024-02-29
        下載權限: 免費會員
        文件大小: 0.01 MB
        文件類型: .doc
        瀏覽次數:
        上傳會員: 龍龍
        所屬欄目: 施工方案
        進入下載頁
        資料簡介

        先張法預應力板梁施工作業指導書
        一、工程概況
        睢寧二標段落內共有先張法預應力板梁1686片,集中在K57+429.00處構件廠預制。板梁為上部主要承力結構,其預制安裝為全橋的關鍵工序。省、市高指、監理單位及我們施工單位較為重視。為確保預應力板梁百分之百合格,必須建立健全質量保證體系,制定切合實際,符合規范要求的方案加強現場管理,落實各項技術保障措施。
        二、總體要求
        1、鋼筋加工,綁扎、焊接符合設計要求。
        2、鋼絞線的存放、安置、張拉均符合規范要求。
        3、梁板外露面光潔平整,砼強度符合設計要求。
        4、梁板的長度、斷面尺寸及拱度值符合設計及《公路工程質量平定標準》。
        5、梁板的運輸、堆放應符合力學規律,安裝情況應符合安全操作規程及質量評定標準。
        三、施工流程
         

        First tensioned slab construction work instructions
        First, project survey
        A total of Suining two standard paragraphs of pretensioned slab 1686, concentrated in the K57 +429.00 Department of prefabricated components factory. Slab for the upper load-bearing structure, the pre-installation of the key processes for the whole bridge. Provinces, municipalities and high refers to the construction supervision unit and our unit more attention. To ensure 100 percent compliance prestressed slab, must establish a sound quality assurance system, to develop practical, comply with regulatory requirements of the program to strengthen field management and the implementation of the technical protection measures.
        Second, general requirements
        1, steel processing, banding, welding meet design requirements.
        2 strand of storage, placement, tensioning meet specifications.
        3, external appearance is smooth slab, concrete strength meets the design requirements.
        4, slab length, section size and camber values comply with the design and the "pacification of Highway Engineering Quality Standards."
        5, Beam transport, stacking should be consistent with mechanical regularity, installations should comply with the safety standard operating procedures and quality assessment.
        Third, the construction process

         

        下載地址

        前往下載