瀝青砼粘層施工方案
一、工程概況
()工程位于()。本合同段段落為(),主要結構層為:();其它工程為()。
二、工料機組成及計劃安排
我項目部已成立多年,由具有豐富經驗的技術干部及普工組成。所有用于粘層工、料、機組成已協調一致,具備開工條件。我不計劃()年()月()日進行試驗段施工。
三、乳化瀝青技術要求
檢查項目 技術要求
篩上殘留量(%) ≤0.1
電荷 陽離子
破乳速度 快裂
粘度 道路標準粘度計C25.3 8-20
Sticky layer of asphalt concrete construction plan
First, project survey
() Project is located (). Paragraph paragraph of this contract is (), the main structure layer: (); other projects ().
Second, the composition and quantity machine scheduling
My Department has set up the project for many years by experienced technical cadres and the general industrial composition. All work for the adhesive layer, material, machine component has been coordinated with start conditions. I do not plan () year () month () on a test section.
3, emulsified asphalt and technical requirements
Check the technical requirements of the project
Sieve residue (%) ≤ 0.1
Cationic charge
Emulsion breaking fast crack
Viscosity Viscometer C25.3 8-20 road standards