滬寧高速公路(江蘇段)擴建工程預制梁預應力混凝土先張法空心板梁施工技術方.doc
進入下載頁
預應力混凝土先張法空心板梁施工技術方案
一、工程概況
HN-E2標段起點位于鎮江市丹陽互通式立交東側,樁號為EKl82+000,沿途經過丹陽市開發區、練湖農場、河陽鎮,終點樁號為EK196+180,全長14.18km。本標段有特大橋1座(京杭運河特大橋),中橋1座,涵洞34道,通道21道,分離式立交橋11座(其中支線上跨橋5座),互通式立交橋2座;路基土石方挖方383335立方,填方726444立方,濕噴樁軟基處理長度為308717.9延米,預應力薄壁管樁27307.5延米。
二、工程規模
本標段采用了L=10m、L=16m和L=20m三種跨徑的預應力砼先張法空心板,L=10m跨徑的預制梁高為0.4m; L=16m跨徑的預制梁高為0.7m; L=20m跨徑的預制梁高為0.85m。L=10m的梁共有64片,L=16m的梁共有16片,L=20m的梁共有64片。
先張法 邊板 中板 高度(cm)
數量 底板寬(cm) 數量 底板寬(cm)
10m 內邊板 外邊板 99.5 48 99 40
8 8
16m 內邊板 外邊板 99.5 12 99 70
2 2
20m 內邊板 外邊板 99.5 48 99 85
8 8
三、施工準備
1、材料
(1)、水泥:江蘇聯合P.O.42.
Pre-tensioned prestressed concrete hollow slab construction technology programs
First, project survey
HN-E2 is located in Zhenjiang City, Danyang Lot from interchange east of Stake to EKl82 +000, Danyang Development Zone, along the way through, training Lake Farm, River Township, end Stake for the EK196 +180, full 14.18km . The tenders are Bridge 1 (Beijing-Hangzhou Canal Bridge), in a bridge, culvert 34, channel 21, separated overpass 11 (where the branch line across the bridge 5), 2 Interchanges; Foundation 383,335 cubic meters of earth excavation, fill 726,444 cubic meters, wet spray Soft pile length 308,717.9 running meters, prestressed thin-walled pipe 27,307.5 running meters.
Second, size of the project
The tenders with a L = 10m, L = 16m and L = 20m of three span prestressed concrete pre-tensioned hollow plate, L = 10m span of the precast beam height is 0.4m; L = 16m span prefabricated beam height is 0.7m; L = 20m span of the precast beam height of 0.85m. L = 10m the beam a total of 64, L = 16m the beam a total of 16, L = 20m the beam a total of 64.
Pre-tensioned sides of plate height (cm)
Number of floor width (cm) the number of floor width (cm)
10m outside the board within the side plates 99.5 489 940
88
16m outside the board within the side plates 99.5 129 970
22
20m outside the board within the side plates 99.5 489 985
88
Third, construction preparation
1, material
(1), cement: Jiangsu Joint P.O.42.