一、工程概況
該橋為正橋,橋長180米,全橋共分兩連,第一聯(lián)為4*20米,第二聯(lián)為5*20米,設(shè)置3道伸縮縫。該橋為雙幅橋,雙幅橋間距為7米,半幅橋面寬16米,車行道8米,內(nèi)側(cè)為0.5米防撞護欄,外側(cè)為7.5米非機動車、行人一體車道;橋面橫坡1.5%,人行道橫坡2.0%。
橋面結(jié)構(gòu)層為:1、 預(yù)應(yīng)力空心板,2、C50水泥混凝土橋面鋪裝10厘米,3、防水涂料防水層,4、中粒式瀝青砼4厘米(AC-201),5、細(xì)粒式瀝青砼3厘米(AC-131)。
人行道結(jié)構(gòu)層為:1、 預(yù)應(yīng)力空心板,2、中砂夯實,3、M10
水泥砂漿3厘米,4、彩色花磚6厘米。
橋面按橋面連續(xù)處理,全橋在橋兩端頭以及4#橋墩設(shè)置伸縮縫,伸縮縫采用(西安自力化學(xué)工業(yè)公司)生產(chǎn)的XA-60伸縮縫或同類產(chǎn)品。
欄桿基座采用C25混凝土澆筑,欄桿采用石制欄桿,F(xiàn)澆欄桿基座在板縫處斷開,縫寬2厘米。
橋面排水采用泄水管排入河中,泄水管直徑10厘米,間距5米,采用樹脂玻璃鋼夾砂管材。
路緣石采用花崗巖路緣石,加工工藝為帶鋸解,加工長度1米,泄水孔處路緣石加工時應(yīng)預(yù)留孔洞。
二、施工組織與部署
(一)施工組織
1、勞務(wù)人員組織
①鋼筋施工組:20人;
②模板施工組:10人;
③混凝土施工組:15人;
First, project survey
The bridge is the bridge to the bridge 180 meters long, divided into two full-bridge link, the first joint of 4 * 20 m, the second of 5 * 20 m, set the three joints. The bridge is double width bridge, double width bridge spacing is 7 meters, 16 meters Banfu voluminous bridge, roadway 8 m, 0.5 m for the guardrail on the inside, outside is 7.5 m of non-motor vehicles, pedestrians, one Drive; deck transverse Singapore 1.5%, 2.0% sidewalk cross slope.
Bridge layer: 1, prestressed hollow, 2, C50 Concrete Bridge Deck 10 cm, 3, waterproof coating waterproofing, 4, in tablets 4 cm asphalt concrete (AC-201), 5, small 3 cm asphalt concrete grain (AC-131).
Pavement layer: 1, prestressed hollow, 2, in the sand compaction, 3, M10
Cement mortar 3 cm, 4, 6 cm color tiles.
Deck by deck continuous treatment, full-bridge and the bridge at both ends of the first set of 4 # pier expansion joints, expansion joints used (self-Xi'an Chemical Industrial Company) production of XA-60 expansion joints, or similar products.
Railing base using C25 concrete pouring, railings with stone railings. Base at the seams cast railings were broken, width of 2 cm.
Deck drainage water into the river by discharge, the vent pipe diameter of 10 cm, 5 m distance using the resin GRP pipe.
Curbs with granite curbs, as the band saw processing solution, process length of 1 meter, outlet hole should be reserved for curbs processing holes.
Second, the construction organization and deployment
(A) of the Construction Organization
1, service staff organizations
① steel construction group: 20;
② Formwork Group: 10;
③ Concrete Construction Group: 15;