萬洋線公路改造項目施工總結
為了加快交通基礎設施建設步伐,促進國民經濟發展,根據國家有關扶持政策,2003年公路體制下放,通過各級政府和公路部門積極爭取將該線路列入國債項目,經贛計基礎字[2003]111號縣鄉公路項目工程可行性研究報告,市計委在同年對工程進行了設審,吉路字[2003]40號對路面施工圖設計的批復。該線全長12.28775公里起始瓜畬鄉陂頭村,終于安福縣楓田鎮洋田村,沿途經過陂頭村、田東村、新民村、洋田村,主線路面結構K18+600—K19+600和K21+260—K22+987.75段為22cm厚水泥混凝土路面+15cm厚水泥穩定砂礫基層+28cm厚天然砂礫墊層,其余路段均為4cm厚瀝青碎石面層+0.5cm瀝青下封層+18cm厚水泥穩定砂礫基層+20cm厚天然砂礫墊層,面層寬度為9m,基層寬度為9.5m,瀝青下封層與基層同寬,墊層為10m。
主要工程量為:厚20cm天然砂礫墊層99230m2,厚28cm天然砂礫墊層27273m2,厚15cm水泥穩定砂
10000 Ocean Line Road Reconstruction Project Construction Summary
To speed up the pace of building transport infrastructure, promote economic development, in accordance with relevant supporting policies, decentralization of 2003, highway system, through all levels of government and highway departments have been actively fighting for the inclusion of the debt line item, based upon total Gan [2003] 111 Rural Road Project Engineering Feasibility Study, City Planning Commission in the same year review of the project was set up, Jilin Road [2003] No. 40 on the road construction design of the approval. 12.28775 km length of the line starting melon She rural Pei Tau Village, finally franca Feng Yang Tin Anfu County, along the way through Pei Tau Tsuen, Tin Village, Xinmin Village, Western Tin, the main line pavement K18 +600- K19 +600 and K21 +260- K22 +987.75 section of the 22cm thick concrete pavement +15 cm thick gravel base +28 cm thick natural gravel bedding, and the remaining sections are 4cm thick asphalt surface layer of gravel under the asphalt seal coat +0.5 cm +18 cm thick cement stabilized gravel base +20 cm thick natural gravel pads, surface width 9m, basic width 9.5m, Bituminous Seal Coat and grass roots with the width of the cushion to 10m.
Volume of major projects: 20cm thick natural gravel cushion 99230m2, 28cm thick natural gravel cushion 27273m2, 15cm thick cement stabilized sand