安田線老區(qū)公路改造項(xiàng)目工程項(xiàng)目總結(jié)
安?h安下至田心6公里被吉安市計(jì)委2003年列為老區(qū)公路建設(shè)項(xiàng)目,2003年市計(jì)委對該工程進(jìn)行設(shè)審,并在同年吉路工字[2003]46號文批準(zhǔn)施工圖紙?jiān)O(shè)計(jì)及經(jīng)費(fèi)批復(fù)。路基土石方41809m3,厚18cm砂礫墊層29772m2,厚16cm水泥穩(wěn)定砂礫基層26887m2,厚0.5cm瀝青下封層26887m2, 厚3cm瀝青碎石23882m2,Ф50cm圓管涵141m,1—2.5m蓋板涵5m,防護(hù)工程擋土墻153.4m3。該路線設(shè)計(jì)標(biāo)準(zhǔn)為山嶺重丘四級公路路基寬為4.5米,路面寬3.5米。
該工程項(xiàng)目經(jīng)吉安市公路局研究決定安田線老區(qū)公路建設(shè)項(xiàng)目施工由安福公路分局承擔(dān),安福公路分局根據(jù)市局的決定,積極組織精兵強(qiáng)將,由分局工會主席羅樹生擔(dān)任該項(xiàng)目的負(fù)責(zé)人,制訂出施工方案和組織設(shè)計(jì),在2003年9月進(jìn)駐工地開始施工,在同年12月中旬工程竣工,通過主管部門的初驗(yàn)和復(fù)驗(yàn),該工程項(xiàng)目評定為合格工程。
二00四年元月
Line of the old liberated areas Yasuda Highway Improvement Project Project Summary
Anfu County Security Center 6 km down to the field by Jian Planning Commission in 2003 as the old liberated areas of highway construction projects in 2003, established the Urban Planning Commission review of the works and road works in the same year, Kyrgyzstan [2003] No. 46, approved construction of the text drawing design and funding approval. Earth and Stone 41809m3, 18cm thick sand cushion 29772m2, thick 16cm cement stabilized gravel base 26887m2, 0.5cm thick Bituminous Seal Coat 26887m2, 3cm thick asphalt gravel 23882m2, Ф50cm Pipe Culvert 141m ,1-2 .5 m Culvert 5m, protection engineering retaining wall 153.4m3. The road design standards for the mountainous four roadbed width of 4.5 meters, 3.5 meters wide road.
The projects were decided by the Bureau of Transportation Jian Yasuda line highway construction projects the old liberated areas Anfu road from the branch to bear, Fuk Road Branch under the Council's decision to crack actively organized by the branch union president Luo Shusheng as the project responsible person, to formulate a construction plan and organizational design, in September 2003 entered the construction site began in mid-December the same year, completion of the project, through the competent departments of the initial inspection and re-inspection, accreditation of the project works.