第一章 綜合說明
1.1.編制說明
1.1.1.編制依據(jù)
(1)《錦屏水電站九龍河口~錦屏一級壩區(qū)輔助道路改建工程(第四標(biāo))招標(biāo)文件》。
(2)招標(biāo)文件提供的設(shè)計(jì)圖紙、工程量清單等有關(guān)資料。
(3)國家及行業(yè)現(xiàn)行設(shè)計(jì)、施工規(guī)范、驗(yàn)收標(biāo)準(zhǔn)及有關(guān)文件。
(4)招標(biāo)期間招標(biāo)單位與投標(biāo)單位所有來往的函件及補(bǔ)遺資料。
(5)我公司對施工現(xiàn)場的實(shí)地勘察、調(diào)查資料。
(6)我公司積累的成熟技術(shù)、科技成果、施工工藝方法及同類工程的施工經(jīng)驗(yàn)。
(7)我公司可調(diào)用到本標(biāo)段工程的各類資源。
1.1.2.編制范圍
錦屏水電站九龍河口~錦屏一級壩區(qū)輔助道路改建工程(第四標(biāo))招標(biāo)文件所規(guī)定的全部工程內(nèi)容,包括:土石方工程、路面、橋梁、隧道、排水及涵洞、防護(hù)工程等。
1.1.3.遵循的規(guī)范和標(biāo)準(zhǔn)
本投標(biāo)文件施工組織設(shè)計(jì)遵循的主要規(guī)范、標(biāo)準(zhǔn)(包括但不限于)見表1-1-1。
遵循的主要規(guī)范、標(biāo)準(zhǔn)表
The first chapter of the consolidated statement
1.1. Preparation instructions
1.1.1. Prepared on the basis
(1) "Jinping Jinping 1 Hydropower Station Dam Kowloon mouth ~ service road alterations (fourth standard) tender documents."
(2) The tender document provides design drawings, bill of quantity and other relevant information.
(3) the current state and industry design, construction specifications, acceptance criteria and related documents.
(4) during the tender bidding and bidding units for all the information from the letter and addendum.
(5) on the construction site of our field investigation, survey data.
(6) our company has accumulated a mature technology, scientific and technological achievements, construction techniques, methods and experience of similar works.
(7) I used this company adjustable types of resources Lot project.
1.1.2. Preparation of the scope of
Jinping Jinping 1 Hydropower Station Dam Kowloon mouth ~ service road alterations (4th standard) under the tender documents of all project elements, including: earthwork, roads, bridges, tunnels, drainage and culverts, protection works.
1.1.3. To follow the norms and standards
Construction design of the tender documents to follow the main norms and standards (including but not limited to) see table 1-1-1.
Follow the main specification, standard table