第一章 編制說明
第一節 編制目的
本施工組織設計編制目的是為鏡湖新區南四路建設工程Ⅱ標段工程投標階段提供較為完整的綱領性文件,中標后,我們將在此基礎上編制可操作的施工組織設計,以其用來指導工程施工與管理,確保優質、高效、安全文明地完成工程施工任務。
第二節 編制說明
1、紹興市作為一個歷史文化名城,又是一個著名的優秀旅游區,也是長江經濟三角洲的一顆耀眼的明珠,不管在經濟和文化上都有著自己深厚的基礎和強勁的發展勢頭,各項基礎設施已日臻完善。擬建的南四路作為紹興大城市中袍江組團與城市綠心相連接的一條主要道路,它的建設必將對進一步完善城市路網框架,加強袍江組團與城市綠心聯系,改善沿線居民的生活及出行條件,促進道路兩側地塊升值有較大的作用,同時對推進紹興城市劃建設進程,促進大城市與鏡湖新區的建設,改善城市環境,提高城市品位都將起到重要的作用。
我公司能參加南四路建設工程Ⅱ標段工程的投標工作,深深地感謝紹興市鏡湖新區建設投資有限公司的信任和厚愛,在此向業主及評標小組的領導、專家表示感謝!
2、公司誠懇的表示:我們完全接受招標文件所提出的質量、工期、安全、文明施工等方面的各項要求,并認真貫徹落實各項方案和技術措施。與業主單位、監理單位、設計單位一起在360個日歷天內共同完成整個工程的施工任務,并保證整個工程及各單位工程驗收均達到優良。為該工程
The first chapter shows the preparation of
Section preparation of purpose
The construction organization design is intended to four construction projects Jinghu New South Lot tender stage Ⅱ provides more complete programmatic document, the successful tenderer, we will be prepared on the basis of operational and construction design, its use to guide the construction and management to ensure high-quality, efficient, safe and civilized completion of construction tasks.
Section II shows the preparation of
1, Shaoxing City, as a historical and cultural city, is a famous tourist area of excellence, but also the Yangtze River Economic Delta, a jewel in the crown, regardless of the economy and culture has its own both a solid foundation and strong development momentum, the key infrastructure has been improving. The proposed South Quad as Shaoxing city tour with urban green in the heart Paojiang connected to a main road, its construction will further improve the urban road network framework, strengthening Paojiang tour contact with urban green center to improve along living and travel conditions for road block on both sides a greater appreciation of the role, while promoting the building of Shaoxing city planning process, promote the construction of cities and the Mirror Lake New Area, improve the urban environment, enhance urban grade will play important role.
Our company can participate in the South Quad Lot construction project bidding Ⅱ, deeply grateful to Mirror Lake, Shaoxing City Construction Investment Co., Ltd. New District of trust and love, in which the owners and evaluation team leaders, experts, thanks!
2, the company sincerely said: We fully accept the tender documents submitted by the quality, duration, safety, civil construction, etc. requirements, and to conscientiously implement the programs and technical measures. Units with the owners, supervision, design units together in 360 calendar days to complete the project co-construction tasks, and to ensure acceptance of the whole project and all units have reached good works. For the project