第一節 編制說明
根據安徽新禧房地產開發有限公司對合肥市馬鞍山南路(東流路~屯溪路)工程的招標文件和設計圖紙的所列要求,我方經過認真閱讀、研究,仔細考察工程施工現場和交通狀況,組織了擬任項目經理及主要項目技術、管理人員進行分析,編制本工程的施工組織設計。在編制過程中,充分考慮了各關鍵重點工序間的銜接與協調和工期緊的特點。在嚴格遵守有關技術規范的前提下,按照市政道路、排水工程的施工與組織管理程序,結合我公司多年的施工經驗和目前的施工技術,編制本工程的施工組織設計。
一、編制依據
1、由安徽新禧房地產開發有限公司提供的合肥市馬鞍山南路(東流路~屯溪路)工程的招標文件、招標補充文件。
2、由合肥市建筑設計研究院設計提供的馬鞍山南路(東流路~屯溪路)工程的施工設計圖。
3、由合肥市勘察院勘測提供的馬鞍山南路(東流路~屯溪路)工程地質勘察報告。
4、工程現場踏勘及業主介紹的情況。
5、市政工程有關施工驗收標準(CJJ1—90、CJJ3--90)及給排水管道工程施工驗收規范(GB50268-97)。
6、本公司近年來已承建過類似工程的施工經驗。
7、本公司ISO9002質量體系系列文件。
二、編制原則
1、遵照招標文件中的各項條款要求進行編制。
2、按“項目法”的施工原則進行管理和施工,嚴格執行有關的施工規范和驗收標準, 按圖施工。
3、制定創優目標,嚴格執行各項施工保證
Section preparation instructions
According to Real Estate Development Co., Ltd. Anhui Sun Hey Ma On Shan South Road in Hefei (flows east Road ~ Tunxi Road) project tender documents and design drawings of the listed requirements, we carefully read, study, study carefully the construction site and traffic conditions organized and designated as project manager and principal project technology, management analysis, the preparation of the project construction organization design. In the preparation process, fully taking into account the key interface between the key processes and coordination and short construction period features. In strict compliance with the technical specifications of the premise, according to municipal roads, drainage works and the organization and management processes, combined with our years of construction experience and the current construction techniques, the preparation of the project construction organization design.
1, prepared on the basis
1, by the Real Estate Development Co., Ltd. Anhui Sun Hey Ma On Shan South Road, Hefei, provided (flows east Road ~ Tunxi Road) project in the tender documents, tender additional documentation.
2 Hefei Institute of Architectural Design by the design of the Ma On Shan South Road (flows east Road ~ Tunxi Road) project design drawing.
3, provided by the Hefei Investigation Institute survey of Ma On Shan South Road (flows east Road ~ Tunxi Road) Engineering geological investigation report.
4, engineering site visit and the owners about the situation.
5, the construction of municipal engineering acceptance criteria (CJJ1-90, CJJ3 - 90) and to the Sewage System Construction Acceptance (GB50268-97).
6, the company has in recent years construction experience in similar works.
7, the company's ISO9002 Quality System Series documents.
Second, principle,
1, in accordance with the terms of tender documents preparation requirements.
2, according to "project" the principles of construction management and construction, and strict enforcement of construction specifications and acceptance criteria, according to the drawings.
3, to develop excellence goals, to ensure strict implementation of the construction