        港區(qū)部分道路及其配套工程BT項(xiàng)目投標(biāo)文件(技術(shù)標(biāo)).doc

        更新時(shí)間: 2024-03-02
        下載權(quán)限: 免費(fèi)會(huì)員
        文件大小: 0.34 MB
        文件類型: .doc
        瀏覽次數(shù):
        上傳會(huì)員: 龍龍
        所屬欄目: 技術(shù)標(biāo)書
        進(jìn)入下載頁
        資料簡(jiǎn)介

        1. 編制依據(jù)和編制原則
        1.1. 編制依據(jù)
        (1)港區(qū)部分道路及其配套工程BT項(xiàng)目招標(biāo)文件;
        (2)業(yè)主對(duì)本工程《建設(shè)項(xiàng)目BT方式招標(biāo)文件答疑》;
        (3)本工程執(zhí)行的施工規(guī)范及驗(yàn)收標(biāo)準(zhǔn)等;
        (4)我單位對(duì)施工現(xiàn)場(chǎng)踏勘和調(diào)查的情況;
        (5)我單位綜合經(jīng)濟(jì)技術(shù)實(shí)力及以往類似工程的施工經(jīng)驗(yàn)。
        1.2. 編制原則
        該工程是太倉港港區(qū)的一項(xiàng)重點(diǎn)工程,也是我公司拓展業(yè)務(wù)的重中之重的頭等大事,為此我公司將投入高效管理班子、一流的隊(duì)伍進(jìn)行施工,確保安全、質(zhì)量、進(jìn)度、文明達(dá)到一流水平,為太倉人民提供滿意的服務(wù)。我們將本著以下原則編制標(biāo)書:
        ⑴本著“百年大計(jì),質(zhì)量第一”的原則:嚴(yán)格按照ISO9002質(zhì)量管理體系原理與要求編制質(zhì)量管理體系,同時(shí)依據(jù)相關(guān)技術(shù)規(guī)范編制各施工工序的質(zhì)量工藝措施,以高標(biāo)準(zhǔn)的工序質(zhì)量來確保全部工程的施工質(zhì)量。
        ⑵堅(jiān)持以設(shè)備保工藝,以工藝保質(zhì)量的原則:配備先進(jìn)施工設(shè)備保證施工工藝,以可靠的施工工藝保證施工質(zhì)量,保證工程質(zhì)量目標(biāo)的實(shí)現(xiàn)。
        ⑶確保施工按期完成的原則:合理安排施工進(jìn)度,應(yīng)用網(wǎng)絡(luò)計(jì)劃技術(shù)合理安排各項(xiàng)工程的施工順序,安排好工序銜接,采用流水作業(yè)和搭接作業(yè)法組織施工,突出重點(diǎn),兼顧一般,確保工期,均衡生產(chǎn),留有余地。
        (4) 確保環(huán)境的原則:注意環(huán)境保護(hù),編制了環(huán)境保護(hù)措施,實(shí)行安全生產(chǎn)、文明施工。
        (5)優(yōu)化方案的原則:優(yōu)化資源配置,科學(xué)組織施工,采取技術(shù)組織措施和管理措施降低工程造價(jià)。
        2. 工程概況及施工條件
        2.1. 編制范圍及工程位置
        根據(jù)港區(qū)部分道路及其配套工程BT項(xiàng)目招標(biāo)文件及業(yè)主答疑要求,本次技術(shù)標(biāo)編制范圍為緯三路施工圖紙(僅含
        1. Preparation of the basis and principle,
        1.1. Prepared on the basis
        (1) ports and supporting some of the roads construction project bidding documents BT;
        (2) The owner of this project "means construction project tender documents BT Q";
        (3) the implementation of this project is the construction specifications and acceptance standards;
        (4) I units of the construction site visit and investigation of the situation;
        (5) I units of comprehensive economic and technical strength and experience of previous similar works.
        1.2. Preparation of the principle of
        The project is one of Taicang Port, the key project is the top priority of our business development a top priority, and I will put effective management team, first-class construction team to ensure the safety, quality, progress, civilization of class, to provide satisfactory services to the people of Taicang. We will be in the preparation of the tender the following principles:
        ⑴ the spirit of "a hundred years, quality first" principle: in strict accordance with ISO9002 quality management system principles and requirements for the preparation of quality management system, also based on the preparation of technical specifications related to the quality of the construction process technology measures to high standards of process quality to ensure that all construction quality.
        ⑵ adhere to device security technology to ensure quality of technology principles: guarantee of construction equipment with advanced construction technology, construction technology to ensure reliable construction quality, ensure the quality of the project goals.
        ⑶ construction schedule to ensure completion of the principle: reasonable arrangement of construction progress of the application of the network planning technique works reasonably arrange construction sequence, arranged processes converge and overlap with assembly-line method of construction operations, focused, taking into account the general, to ensure that the duration , balanced production, leaving room for.
        (4) to ensure that environmental principles: attention to environmental protection, the preparation of the environmental protection measures, the implementation of safety and civilized construction.
        (5) optimization program principles: optimizing resource allocation, scientific organizations, construction, technical organizations to take measures and management measures to reduce the project cost.
        2. Project Overview and Construction Conditions
        2.1. Preparation of the scope and project location
        According to some of the roads and ancillary works Harbor BT project tender documents and answering the owners request, the scope of this technical standard preparation of construction drawings for the weft three-way (only
         