鋼筋制作安裝工程安全作業(yè)交底.doc
進(jìn)入下載頁(yè)
內(nèi)容摘要:
1、 每個(gè)工人都應(yīng)自覺(jué)遵守南靖信達(dá)建筑工程有限公司的各種規(guī)章制度。
2、 鋼材、半成品等應(yīng)按規(guī)格、品種分別堆放整齊。制作場(chǎng)地要平整,操作臺(tái)要穩(wěn)固,照明燈具必須加網(wǎng)罩。
3、 拉直鋼筋,卡頭要卡牢,地錨要結(jié)實(shí)牢固,拉筋沿線2米區(qū)域內(nèi)禁止行人。人工絞磨拉直,禁止用胸、肚接觸推桿;并緩慢松解,不得一次松開(kāi)。
4、 展開(kāi)圓盤鋼筋要一頭卡牢,防止回彈,切斷時(shí)要先用腳踩牢。
5、 在高空、深坑綁扎鋼筋和安裝骨架,須搭設(shè)腳手架和馬道。
6、 綁扎立柱、墻體鋼筋,不得站在鋼筋骨架上和攀登骨架上下。柱筋在4米以下且重量不大,可在地面或樓面上綁扎,整體豎起;柱筋在4米以上應(yīng)搭設(shè)工作臺(tái);柱、梁骨架應(yīng)用臨時(shí)支撐拉牢,以防傾倒。
7、 綁扎基礎(chǔ)鋼筋時(shí),應(yīng)按施工操作規(guī)程擺放鋼筋支架(馬凳)架起上部鋼筋,不得任意減少支架或馬凳。
8、 多人合運(yùn)鋼筋,起、落、轉(zhuǎn)、停動(dòng)作要一致,人工上下傳送不得在同一垂直線上;鋼筋 堆放要分散、穩(wěn)當(dāng),防止傾倒和塌落。
9、 點(diǎn)焊、對(duì)焊鋼筋時(shí),焊機(jī)應(yīng)設(shè)在干燥的地方;焊機(jī)要有防護(hù)罩并放置平穩(wěn)牢固,電源通過(guò)漏電保護(hù)器,導(dǎo)線絕緣良好。
10、電焊時(shí)應(yīng)戴防護(hù)眼鏡和手套,并站在膠木板或木板上。電焊前應(yīng)先清除易燃易爆物品,停工時(shí),確認(rèn)無(wú)火源后,方準(zhǔn)離開(kāi)現(xiàn)場(chǎng)。
11、鋼筋切斷機(jī)應(yīng)機(jī)械運(yùn)轉(zhuǎn)正常,方準(zhǔn)斷料。手與刀口距離不得少于是15cm。電源通過(guò)漏電保護(hù)器,導(dǎo)線絕緣良好。
12、切斷鋼筋禁止超過(guò)機(jī)械負(fù)載能力;切長(zhǎng)鋼筋應(yīng)有專人扶住,操作動(dòng)作要一致,不得任意拖拉。切斷鋼筋要用套管或鉗子夾料,不得用手
Abstract:
1, each worker should consciously abide by Nanjing Construction Co., Ltd. Xinda the various rules and regulations.
2, steel, semi-finished products and so on should be standard varieties were stacked neatly. Production sites should be even, to a solid console, lighting must be added the guard.
3, straighten the bars, the first card to card firm, a firm anchor firmly, stretch 2 m area along the pedestrian is prohibited. Artificial straightening cutter grinding, the ban on the chest, belly putter contacts; and slow release, not a release.
4, expand disk firmly reinforced to a card, to prevent the rebound, when the first cut off with a foot firmly.
5, at high altitude, deep steel banding and installation framework, to scaffold erection and bridleways.
6, lashing column, wall reinforcement, not standing on a steel skeleton and the skeleton climbing up and down. Column bars at 4 meters and the weight not much on the ground or floor surface banding, the overall erect; column reinforcement should be 4 meters above the erection workbench; columns, beams application of temporary support to pull skeleton prison, to prevent dumping.
7, lashing the basis of reinforcement, the construction of operational procedures should be placed steel stent (Ma stool) erected the upper bar, may not arbitrarily reduce the stent or horse stool.
8, more than co-operation reinforced, since, down, turn, stop action to be consistent, manual loading and transfer shall not be in the same vertical line; steel piling to be distributed, reliable, to prevent dumping and collapse.
9, spot welding, welded steel, the welder should be located in a dry place; welder must have a strong shield and put a smooth, power through leakage protection, well-insulated wire.
10, welding should wear protective glasses and gloves, and stood on a plastic board or plank. Welding should be preceded by clear inflammable and explosive materials, work stoppage, the recognized non-fire source shall be allowed to leave the scene.
11, steel cutter machine in normal operation should be allowed to be broken material. Hand with the knife-edge distance of not less than a 15cm. Power through leakage protection, well-insulated wire.
12, cutting off more than mechanical load capacity of reinforced ban; Cut hand held onto the bar should operate to the same action shall not be any drag. Cut steel casing or pliers to use material, not hands