荊東高速馬市高架橋
30m預應力T梁外觀質量控制
一、工程概況
馬市高架橋位于湖北省荊州市公安縣埠河鎮馬市村境內,馬市高架橋屬于湖北省荊東高速公路一期工程該橋全長9.09公里,起訖里程為K13+060~K22+150,我單位施工其中的1.2公里,起訖里程為K13+690~K14+890,總造價為4650萬元。該工程下部結構為φ1.5m鉆孔樁基礎、φ1.4m雙柱式墩、懸臂式帽梁;上部構造為30m預應力混凝土先簡支后連續T梁,全橋上下行分離,中間設等間距(1.0米)分隔帶。管段主要工程數量為:鉆孔樁160根,墩柱160根(平均高度為6m),帽梁80條,480片T梁(后張),3.0萬m2橋面鋪裝,1200延米防撞墻。計劃工期26個月,至2005年5月竣工。
工程創優目標:工程合格率100%,分部工程優良率100%,創湖北省優良樣板工程。
二、QC小組概況
QC小組概況
City Viaduct East High Speed Ma Jing
30m prestressed T beams Appearance quality control
First, project survey
Ma City Viaduct is located in Hubei Province port Town in the county public security within the village horse market, horse market in Hubei Jing East Expressway viaduct is a bridge length 9.09 km project start and end mileage K13 +060 ~ K22 +150, I unit construction of 1.2 km of which start and end mileage K13 +690 ~ K14 +890, the total cost for the 46.5 million yuan. The substructure of bored pile foundation for the φ1.5m, φ1.4m two-column pier, cantilevered cap beam; superstructure for the 30m simply supported prestressed concrete continuous T beam, separating the whole bridge down the middle set, etc. spacing (1.0 m) median. The number of pipe major projects: bored piles 160, Pier 160 (average height of 6m), cap beam 80, 480 T beam (post-tensioned), 30 000 m2 deck pavement, 1,200 linear meters bump wall . Programme duration 26 months, to be completed in May 2005.
Engineering excellence goal: engineering 100% pass rate, 100% branch works fine, the highest quality model project in Hubei Province.
Second, QC Group Overview
QC Group Overview