        第一卷 混合結(jié)構(gòu)多層住宅摟工程施工組織設(shè)計
        第一章 工程概況
         本工程是幾家工廠合建的四棟住宅樓,每棟均為四個單元組合,五層,采用標準圖,每棟面積為3403m2,共計13612m2。
         每棟建筑物采用甲—乙—甲—丁四單元組合,總長62.02m,寬10.22m,層高2.90m,全高15.29m。開間為2.70m、3.00m、3.30m三種。進深為4.80m、5.02m二種。室內(nèi)±0.00絕對標高從35.75至35.90m,每兩棟相差0.15m,室內(nèi)外高差均為0.60m。
         現(xiàn)場地勢高低不平,并有舊房屋拆除后的基礎(chǔ),自然地坪為35.05m至35.20m,低于室外絕對標高。根據(jù)地質(zhì)鉆探資料,現(xiàn)場地下水位較低,故施工時基礎(chǔ)底部不會出現(xiàn)地下水,可不考慮排水措施;A(chǔ)持力層為粉質(zhì)粘土。
         基礎(chǔ)為剛性基礎(chǔ),天然地基,地基上為450mm厚3:7灰土,磚砌大放腳。基底標高在-2.20m至-2.60m之間,-0.90m處有一道鋼筋混凝土圈梁。建筑物按8度抗震設(shè)防設(shè)計,結(jié)構(gòu)為磚墻承重,外墻370mm,內(nèi)墻240mm,隔斷墻120mm,單元四個大角、樓梯間、內(nèi)外墻交接處、樓梯間兩側(cè)墻均設(shè)抗震組合柱。每層設(shè)置圈梁。樓板為預(yù)應(yīng)力圓孔板,屋頂板為加氣混凝土屋面板,預(yù)制混凝土挑檐板。屋面為二氈三油防水作法。
         外檐以清水墻為主,僅檐口、樓梯間、陽臺欄板為干粘石面層。內(nèi)檐除廚廁為1.2m高水泥墻裙外,其余均為白灰抹面,120mm踢腳板,頂板勾縫噴漿,樓面為35mm豆石混凝土抹面,木門、鋼窗。
         設(shè)備有上、下水,暖氣、照明,每個單元配水、電表各一個。室外管線均接通至小區(qū)干線。

        Vol-rise residential mixed brush structure construction organization design
        Chapter Project Overview
         The project is jointly built by several factories 4 residential building, a complete circuit of the four units are combined, five-story, standard map, a complete circuit of an area of 3403m2, a total of 13612m2.
         Each building with A - B - A - Ding four units combined, length 62.02m, width 10.22m, storey 2.90m, full-height 15.29m. Bay is 2.70m, 3.00m, 3.30m of three. Into the deep 4.80m, 5.02m two. Indoor absolute elevation from 35.75 ± 0.00 to 35.90m, a difference of every two 0.15m, the height difference inside and outside are 0.60m.
         Field rugged terrain and have the foundation after the demolition of old housing, natural floor to 35.05m to 35.20m, lower than outdoor absolute elevation. According to geological drilling data, the lower the groundwater level on site, so construction will not be based on the bottom of the ground water, drainage measures from time to consider. Bearing layer is silty clay.
         Basis for the rigid foundation, the natural foundation, the foundation for the 450mm thick 3:7 lime, brick big up leg. Base elevation to-2.60m-2.20m in between,-0.90m Department has a reinforced concrete ring beam. Building by 8 degree earthquake design load-bearing brick wall structure, wall 370mm, internal walls 240mm, partition wall 120mm, Unit 4 Cape, staircases, internal and external wall junction, staircases, columns on both sides of the wall are equipped with seismic . Ring beam on each floor. Hole to prestressed floor panels, roof panels for the roof of aerated concrete, precast concrete eaves board. Roofing felt for the two three oil waterproofing practices.
         Wai Yan wall with water-based, only cornices, staircase, balcony railing to dry sticky stone surface. In addition to kitchen and toilet within the eaves is 1.2m high concrete wall panels, the rest are white ash Plastering, 120mm skirting board, roof pointing shotcrete, concrete floor for the 35mm pisolite Plastering, wooden doors, steel window.
         Equipment, the water, heating, lighting, water distribution per unit, each one meter. Outdoor pipes are connected to the cell lines.