        磚混、外磚內(nèi)模結(jié)構(gòu)鋼筋綁扎
        本技術(shù)交底適用于工業(yè)與民用建筑磚混結(jié)構(gòu)、外磚內(nèi)模結(jié)構(gòu)的構(gòu)造柱、圈梁、板縫鋼筋綁扎工程。
        1.材料要求
        (1)鋼筋出廠合格證和復(fù)試試驗報告結(jié)論均要符合設(shè)計和規(guī)范要求。
        (2)成型鋼筋、20~22號火燒絲、水泥砂漿墊塊(或塑料卡)。
        2.主要機具
        鋼筋鉤子、小撬棍、鋼筋板子、綁扎架、鋼絲刷、運鋼筋手推車、粉筆、腳手架、工作臺等。
        3.作業(yè)條件
        (1)按施工平面圖規(guī)定的位置平整好場地,按不同規(guī)格型號墊好堆放。
        (2)進場鋼筋應(yīng)對照設(shè)計圖紙和配料單,詳細(xì)核對其型號、尺寸、數(shù)量、鋼號、對焊的接焊質(zhì)量。
        (3)彈好標(biāo)高水平線及構(gòu)造柱、外磚內(nèi)模混凝土墻的外皮線。
        (4)圈梁及板縫模板已做完預(yù)檢記錄,并將模內(nèi)雜物清理干凈。
        (5)預(yù)制圓孔板的端孔已按標(biāo)準(zhǔn)圖(京92G41)的要求堵好。
        4.操作工藝
        (1)構(gòu)造柱鋼筋綁扎:
        工藝流程:
        預(yù)制構(gòu)造柱鋼筋骨架→修整底層伸出的構(gòu)造柱搭接筋→安裝構(gòu)造柱鋼筋骨架→綁扎搭接部位箍筋
        1)預(yù)制構(gòu)造柱鋼筋骨架:
        A.先將兩根豎向受力筋平放在綁扎架上,畫箍
        Brick, brick internal model of foreign steel banding
        The technical disclosure for industrial and civil construction brick, brick outer structural column within the model structure, ring beam, slab joint steel banding project.
        1. Material requirements
        (1) steel factory test certificate and re-testing to the report's conclusions are consistent with the design and specifications.
        (2) reinforcement steel, 20 to 22 fire wire, cement mortar Pad (or plastic card).
        2. Major equipment
        Steel hook, small crowbars, steel board, lashing rack, wire brush, steel trolley transportation, chalk, scaffolding, working platforms and so on.
        3. Operating conditions
        (1) The location of the construction plan provides a good level site, according to different specifications and models good pad stack.
        (2) approach control design drawings of reinforced and ingredients should be a single, detailed verification of its type, size, quantity, steel, butt welding quality of the access.
        (3) good elevation level and structure elastic column, outside the brick wall of concrete inside the skin line.
        (4) ring beam and slab joint template has been done pre-recorded, and mold clean up debris.
        (5) pre-hole side plate hole has been the standard map (Beijing 92G41) the requirements of good blocking.
        4. Operation Process
        (1) structural steel columns Binding:
        Process:
        Prefabricated structural steel skeleton → pillar trim the bottom out of the structural column reinforcement lap steel skeleton structural column → install → stirrup position lap banding
        1) prefabricated steel frame construction column:
        A. First two vertical bars flat on the lashing force shelves, painted hoop
         