磚混結構(構造柱、圈梁、板縫等)砼澆筑技術交底.doc
進入下載頁
交底提要:
交底內容:
磚混結構(構造柱、圈梁、板縫等)砼澆筑
本技術交底適用于磚混結構,包括外磚內模和外板內模結構的構造柱、圈梁、板縫等現澆混凝土工程。
1.材料要求
(1)水泥;用325~425號礦渣硅酸鹽水泥或普通硅酸鹽水泥。
(2)砂:宜用粗砂或中砂。
(3)石子:構造柱、圈梁宜用粒徑0.5~3.2厘米的卵石或碎石;板縫用粒徑0.5~1.2厘米豆石或碎石。
(4)外加劑:根據要求選用早強劑和減水劑等。摻用時必須有試驗依據。
2.作業條件
(1)混凝土配合比需經試驗室確定,配合比通知單與現場使用材料相符。
(2)模板牢固、穩定,標高尺寸符合要求,模板縫隙最大不得超過2.5毫米,過大者應堵嚴,并辦完預檢手續。
(3)綁好鋼筋并辦完隱檢手續。
(4)構造柱、圈梁及板縫施工縫接搓處的松散混凝土和砂漿,應剔鑿清理并將模板內雜物清除干凈。
(5)常溫施工時,在混凝土澆灌前,磚墻、木模應提前適量澆水濕潤,但不得有積水。
3.操作工藝
工藝流程:
作業準備→混凝土攪拌→混凝土運輸→混凝土澆灌、振搗→混凝土養護
(1)混凝土攪拌:
1)根據測定的砂石含水率調整配合比中的
Cards on the table Abstract:
Cards on the table contents:
Brick-concrete structure (structural columns, ring beams, seams, etc.) Pouring
The technical disclosure applies to brick and concrete structure, including the internal model and the outside brick mold structure within the outer structural column, ring beam, slab joint projects such as pouring concrete.
1. Material requirements
(1) cement; with 325 ~ 425 slag Portland cement or ordinary Portland cement.
(2) sand: coarse sand or the sand is preferred.
(3) stone: structural columns, ring beams and it is appropriate particle size of 0.5 to 3.2 cm gravel or crushed stone; seams with a diameter of 0.5 to 1.2 cm beans stone or gravel.
(4) Admixture: selected early strength agent, upon request, and water reducing agent. Must be mixed with a test basis.
2. Operating conditions
(1) concrete mix be determined by the laboratory, with the use of materials than the notice in line with the site.
(2) template solid, stable, and elevation measurements meet the requirements of the largest template shall not be more than 2.5 mm gap, were too strict to be blocked, and after finishing pre-screening procedures.
(3) Tie bar, and after finishing implicit review procedures.
(4) structural columns, ring beams and slab joint construction joint then twist Department of loose concrete and mortar, chisel should tick debris clean-up and cleaned within the template.
(5) at room temperature construction, before pouring the concrete, brick, wood mold should be moist before watering amount, but not with water.
3. Operation Process
Process:
Concrete mixing operation ready → → → concrete pouring of concrete transport, concrete curing vibrated →
(1) Concrete Mixing:
1) The adjustment of water content measured with the ratio of sand and gravel in