磚混、外磚內模結構鋼筋綁扎技術交底.doc
進入下載頁
交底內容:
磚混、外磚內模結構鋼筋綁扎
本技術交底適用于工業與民用建筑磚混結構、外磚內模結構的構造柱、圈梁、板縫鋼筋綁扎工程。
1.材料要求
(1)鋼筋出廠合格證和復試試驗報告結論均要符合設計和規范要求。
(2)成型鋼筋、20~22號火燒絲、水泥砂漿墊塊(或塑料卡)。
2.主要機具
鋼筋鉤子、小撬棍、鋼筋板子、綁扎架、鋼絲刷、運鋼筋手推車、粉筆、腳手架、工作臺等。
3.作業條件
(1)按施工平面圖規定的位置平整好場地,按不同規格型號墊好堆放。
(2)進場鋼筋應對照設計圖紙和配料單,詳細核對其型號、尺寸、數量、鋼號、對焊的接焊質量。
(3)彈好標高水平線及構造柱、外磚內模混凝土墻的外皮線。
(4)圈梁及板縫模板已做完預檢記錄,并將模內雜物清理干凈。
(5)預制圓孔板的端孔已按標準圖(京92G41)的要求堵好。
4.操作工藝
(1)構造柱鋼筋綁扎:
工藝流程:
預制構造柱鋼筋骨架→修整底層伸出的構造柱搭接筋→安裝構造柱鋼筋骨架→綁扎搭接部位箍筋
1)預制構造柱鋼筋骨架:
A.先將兩根豎向受力筋平放在綁扎架上,畫箍筋間距。
B.根據畫線位置,將箍筋套在受力筋上逐個綁扎;要
Cards on the table contents:
Brick, brick internal model of foreign steel banding
The technical disclosure for industrial and civil construction brick, brick outer structural column within the model structure, ring beam, slab joint steel banding project.
1. Material requirements
(1) steel factory test certificate and re-testing to the report's conclusions are consistent with the design and specifications.
(2) reinforcement steel, 20 to 22 fire wire, cement mortar Pad (or plastic card).
2. Major equipment
Steel hook, small crowbars, steel board, lashing rack, wire brush, steel trolley transportation, chalk, scaffolding, working platforms and so on.
3. Operating conditions
(1) The location of the construction plan provides a good level site, according to different specifications and models good pad stack.
(2) approach control design drawings of reinforced and ingredients should be a single, detailed verification of its type, size, quantity, steel, butt welding quality of the access.
(3) good elevation level and structure elastic column, outside the brick wall of concrete inside the skin line.
(4) ring beam and slab joint template has been done pre-recorded, and mold clean up debris.
(5) pre-hole side plate hole has been the standard map (Beijing 92G41) the requirements of good blocking.
4. Operation Process
(1) structural steel columns Binding:
Process:
Prefabricated structural steel skeleton → pillar trim the bottom out of the structural column reinforcement lap steel skeleton structural column → install → stirrup position lap banding
1) prefabricated steel frame construction column:
A. First two vertical bars flat on the lashing force shelves, painting the spacing.
B. According to the drawn line position, the stirrup bars on the force set in the by-banding; to
