        臨時(shí)用電施工組織設(shè)計(jì)

        工程名稱(chēng) 八里店鎮(zhèn)**標(biāo)準(zhǔn)廠房
        四標(biāo)段28#樓 工程地點(diǎn) 八里店鎮(zhèn)**曹報(bào)村
        建筑面積(M2) 11811.6 建筑高度(M) 14.2 開(kāi)工日期 2005.8.25
        施工現(xiàn)場(chǎng)勘測(cè)情況(現(xiàn)場(chǎng)的地形、地貌,正式工程的位置,建筑材料、器具堆放位置,生產(chǎn)、生活暫設(shè)建筑物位置,用電設(shè)備裝設(shè)位置,現(xiàn)場(chǎng)周?chē)h(huán)境等):
        本工程落址于八里店鎮(zhèn)**曹報(bào)村,東臨空地,南臨公寓、西臨空地、北臨27#樓。建筑物東西長(zhǎng)108米,南北寬36米、結(jié)構(gòu)層次三層,結(jié)構(gòu)類(lèi)型框架結(jié)構(gòu),平面呈長(zhǎng)方形。施工現(xiàn)場(chǎng)建筑材料按平面布置圖堆放。木工制作及模板堆放在建筑物中間的西北面,鋼筋制作場(chǎng)及堆放在建筑物東北面;攪拌機(jī)、水泥罐、黃砂、碎石、磚堆放場(chǎng)等材料堆放在建筑北面。QTZ40T/M安裝在建筑物北面。鋼筋機(jī)械、電焊機(jī)、圓盤(pán)機(jī)等各機(jī)械擺放在鋼筋、模板制作場(chǎng)地。生活設(shè)施:民工宿舍、食堂、男、女廁所、淋浴室暫時(shí)設(shè)置在施工現(xiàn)場(chǎng)外面的西面。傳達(dá)室設(shè)置東北面,倉(cāng)庫(kù)、辦公室設(shè)置在建筑物西北面,施工現(xiàn)場(chǎng)的總配電箱安裝在建筑物西北面,1#、2#、3#、4#、5#、6#、7#動(dòng)力分電箱和1#、2#、3#照明分配電箱,各箱安裝在各機(jī)械設(shè)備旁。建筑物四周用磚圍墻圍護(hù),進(jìn)出主入口設(shè)置在東面,現(xiàn)場(chǎng)施工用電具體詳見(jiàn)表四、表七、表十一、

        Design of the temporary use of Electricity

        Project Name Zhen ** standard factory Bali
        4 Lot 28 # Building Project site reports Pali village Cao Zhen **
        Floor area (M2) 11811.6 building height (M) 14.2 start date 2005.8.25
        Surveying the construction site conditions (site topography, the official position of the project, building materials, appliances stacked position, production and life of temporary building location, location of electrical equipment installation, on-site environment, etc.):
        This project off the site in the North reportedly Cao Zhen ** village, east of the open space, apartment south west open space, bounded by 27 # floor. Building 108 meters from east to west, north and south 36 meters wide, three-level structure, the structure type of frame structure, flat rectangular. The construction site of building materials stacked by floor plans. Wood production and templates stacked in the middle of the northwest building, steel production and the stacked field northeast of the building; mixer, cement tanks, yellow sand, gravel, bricks and other material stacked in storage field construction north. QTZ40T / M installed in the building north. Steel machinery, welding, machine and other mechanical disc placed in the steel, the template-production. Living facilities: migrant workers dormitories, canteens, men, ladies room, shower room being set up at the construction site outside of the west. Janitor's room set the northeast, warehouses, office buildings set in the northwest, the construction site of the main distribution box installed in the building north-west, 1 #, 2 #, 3 #, 4 #, 5 #, 6 #, 7 # Power Distribution box and 1 #, 2 #, 3 # lighting electrical distribution box, the box next to mechanical equipment installed in each. Brick wall around the building envelope, and out of the main entrances to the east, on-site Construction Power specific see Table 4, Table 7, Table 11,
         