巴迪倉儲工程施工組織設計.doc
進入下載頁
施工組織設計
第一節 施工總平面布置
施工總平面布置合理與否,將直接關系到施工進度的快慢和安全文明施工管理水平的高低。為保證現場施工順利進行,具體的施工平面布置原則為:
1.滿足施工的前提下,盡量節約施工用地;
2.在滿足施工需要和文明施工的前提下,合理布置材料堆場;
3.盡可能避免土建、安裝相互干擾;
4.符合施工現場衛生及安全技術要求和防火規范;
根據以上原則施工現場布置有:臨時圍墻、臨時辦公住房、施工道路、給排水、電、混凝土攪拌機、灰漿攪拌機、鋼筋加工車間、模板加工車間、標準養護室、燈塔等(詳見施工總平面圖)。
第二節 測量方案
1.測量設備選用及測量程序
現場配備1臺全站儀、2臺J2 光學經緯儀和2臺DZS3 水準儀、兩把50米鋼卷尺。
2.測量控制網點標樁
根據施工測量的需要和市規劃局提供的水準點結合現場的情況,水準點需引測的按三等水準測量的要求引測一組便于施工、通視較好、基本等距的等邊三角水準點于現場,并設置保護樁保護起來,而且還要不定期檢查,確保精度,水準點安裝方法如圖。
本工程施工測量控制網點標樁的埋設采用現澆鋼筋混凝土標樁形式,標樁埋深在2~3m,高出地面約300mm.,在標樁的頂部埋設100×100mm的不銹鋼標板,在Construction Design
Section I construction general layout
Construction of the general layout is reasonable or not, will have a direct bearing on the pace of construction progress and safety of civilization, the level of construction management. In order to ensure the smooth progress of site construction, concrete construction layout principles are:
1. Satisfy the premise of construction, saving as much as possible construction sites;
2. In meeting the needs and civil construction works under the premise of rational arrangement of material storage yard;
3. As far as possible to avoid civil works, installation of mutual interference;
4. Meet the construction site health and safety requirements and fire safety;
According to this principle the construction site layout are: temporary wall, temporary housing, office and construction roads, drainage, electricity, concrete mixers, mortar mixers, steel processing plant, the template processing workshop, standard curing room, lighthouse etc. (see Construction Map) .
Section measurement program
1. Measurement equipment and measurement procedures used
Site with a total stations, 2 J2 2 sets of optical theodolite and DZS3 Level, 2 50 m steel measuring tape.
2. Survey Control Network stake
Under construction survey Di needs and standards of the Urban Planning Bureau According to the field point of the situation, the standard Points would need to Yin measured An Third Order Leveling Yaoqiu Yinceyizu easy construction, Tongshi good, the other Bian Ji Ben equidistant triangle standard point in the scene and set up protection of pile protection, but also occasional checks to ensure the accuracy, quality point of installation method shown in Figure.
The construction survey control network using standard pile of buried cast reinforced concrete stakes forms, stakes depth in the 2 ~ 3m, above the ground about 300mm., Laid on top of piles in the standard 100 × 100mm stainless standard plates in