北京易初蓮花連鎖超市有限公司朝陽購物中心改擴建工程施.doc
進入下載頁
目 錄
第一部分:編制依據-------------------------------------------5
1.編制依據-------------------------------------------------6
第二部分:工程概況-------------------------------------------9
2.1 工程基本情況-------------------------------------------10
2.2 工程關鍵項目-------------------------------------------21
2.3 工程施工流程 --------------------------------------------22
第三部分:施工部署------------------------------------------24
3.1 項目管理機構及職能(含職責劃分)------------------------25
3.2 項目管理主要目標--------------------------------------28
3.3 施工準備----------------------------------------------29
3.4 施工平面布置------------------------------------------30
3.5 臨時設施----------------------------------------------32
第四部分:主要施工機具和勞動力使用計劃----------------------33
4.1主要施工機具計劃--------------------------------------34
4.2勞動力計劃--------------------------------------------37
第五部分:施工進度計劃和保證措施 ---------------------------39
5.1施工進度計劃控制--------------------------------------41
5.2 進度計劃保證措施--------------------------------------43
5.3進度計劃表--------------------------------------------44
第六部分:主要保證措施---------------------------------------45
6.1質量保證措施------------------------------------------46
6.2 安全保證措施------------------------------------------59
6.3 成品保護措施------------------------------------------66
6.4 文明施工管理措施--------------------------------------67
6.5 環保控制措施------------------------------------------68
6.6 “非典”預防措施----------------------------------------72
6.7 各方配合措施------------------------------------------78
6.8 服務保證措施------------------------------------------87
6.9 雨季施工措施------------------------------------------88
第七部分:主要分部分項工程施工措施--------------------------93
7.1土建工程-----------------------------------------------94
7.1.1 鋼結構----------------------------------------------94
7.1.2 結構加固--------------------------------------------103
7.1.3 鋼筋混凝土工程和室外工程----------------------------114
7.1.4 其它------------------------------------------------120
7.1.5 測量控制管理----------------------------------------121
7.2 空調工程----------------------------------------------127
7.3 電氣工程----------------------------------------------134
7.4 給排水工程--------------------------------------------150
7.5 裝修工程----------------------------------------------167
第八部分:施工技術管理--------------------------------------193
8.1計量管理-----------------------------------------------194
8.2 技術資料管理------------------------------------------194
8.3 圖紙設計深化管理--------------------------------------195
附表:
1. 質量保證體系圖
2. 安全保證體系圖
3. 項目主要成員名單
4. 施工進度計劃表
5. 施工現場平面圖
6. 主要材料一覽表
CONTENTS
Part I: preparation according ------------------------------------------- 5
1. Preparation according ---------------------------------------------- --- 6
Part II: Project Overview ------------------------------------------- 9
------------------------------------------- 2.1 Basic Engineering 10
2.2 Project Key ------------------------------------------- 21
-------------------------------------------- 22 2.3 Construction Process
Part III: Construction of the deployment ------------------------------------------ 24
3.1 Project management agencies and functions (including segregation of duties )------------------------ 25
3.2 The main objective of project management, -------------------------------------- 28
Construction preparation ---------------------------------------------- 29 3.3
------------------------------------------ 30 3.4 Construction layout
3.5 Temporary facilities ---------------------------------------------- 32
Part IV: Major construction machinery and labor use plan ---------------------- 33
4.1 The 34 key construction equipment plan --------------------------------------
-------------------------------------------- 37 4.2 Workforce Planning
Part V: The construction schedule and ensure that measures --------------------------- 39
5.1 Construction Schedule Control -------------------------------------- 41
5.2 schedule assurance measures -------------------------------------- 43
5.3 Progress Form -------------------------------------------- 44
Part VI: The main assurance measures --------------------------------------- 45
6.1 Quality assurance measures ------------------------------------------ 46
Safety assurance measures 6.2 ------------------------------------------ 59
6.3 product protection ------------------------------------------ 66
6.4 civilized construction management -------------------------------------- 67
------------------------------------------ 68 6.5 Environmental control measures
6.6 "SARS" prevention ---------------------------------------- 72
6.7 with the measures the parties ------------------------------------------ 78
------------------------------------------ 87 6.8 service assurance measures
6.9 Construction of measures in the rainy season ------------------------------------------ 88
Part VII: The main sub-part of the project construction measures -------------------------- 93
7.1 Civil Engineering ----------------------------------------------- 94
7.1.1 Steel --------------------------------------------- -94
7.1.2 Structural Strengthening -------------------------------------------- 10.3
7.1.3 Reinforced concrete works and external works ---------------------------- 114
7.1.4 Other ---------------------------------------------- - 120
7.1.5 Survey control ---------------------------------------- 121
7.2 The air conditioning works ---------------------------------------------- 127
7.3 Electrical Engineering ---------------------------------------------- 134
7.4 Water Supply and Drainage Project -------------------------------------------- 150
7.5 renovation ---------------------------------------------- 167
Part VIII: Construction Technology Management -------------------------------------- 19.3
8.1 Measurement and Management ----------------------------------------------- 194
8.2 Technical Data Management ------------------------------------------ 194
8.3 Drawing design development management -------------------------------------- 195
Schedule:
1. Quality assurance plan
2. Safety Assurance System Chart
3. Project a list of key
4. Construction progress schedule
5. The construction site plan
6. Main material list