大型建筑工程施工組織設(shè)計(jì).doc
進(jìn)入下載頁
. 工程概況及工程特點(diǎn)
1.1 工程基本情況
建筑總面積227111平方米,分為南區(qū)、北區(qū)、西棟、中心圓廳建筑等幾部分。它們均用構(gòu)架相連。
本工程建筑為橢圓形平面,長(zhǎng)軸386米,短軸264米。其中13~20軸處的短軸與穿過基地的永久河道平行,永久河道寬30米,綠化和通道寬24米。
本工程地下局部1層,地上4層,局部6層。建筑高度20.70米,局部38.70米,標(biāo)志塔高70.00米,中部建筑裝飾圓頂高38.40米。
本工程一層地下室分南、北兩部:北部為地下機(jī)動(dòng)車庫及自行車庫兼六級(jí)人防人員掩蔽室,南部為機(jī)動(dòng)車庫及動(dòng)力、變配電機(jī)房和部分自行車;車庫、人防部分層高3.60米,動(dòng)力機(jī)房層高7.20米,變配電層高6.00米。
首層分南、北、中三個(gè)部分:北部為公司行政部分入口和技術(shù)支持入口,研發(fā)中心對(duì)外接待、銷售、展示部分等,層高5.4米。中部為庭園及景觀水面。南部為工廠行政入口和員工入口、廚房等,層高5.4米。東南部為工廠進(jìn)貨、卸貨區(qū)。車間、庫房部分等,層高6.90米。
二層主要分兩部分:北部為研發(fā)中心、技術(shù)支持、培訓(xùn)部分,南部為工廠車間、庫房及員工餐廳。中間東部連接體為技術(shù)支持。工廠車間及庫房區(qū)層高6.00米其余部分層高4.50米。南北部
. Engineering Survey and Engineering Features
1.1 The basic situation of project
Total construction area of 227,111 square meters, divided into South, North, West Building, the center circle hall construction parts. They are connected with the framework.
The engineering and construction for the ellipse plane, the long axis of 386 m, short axis of 264 meters. 13 to 20 short axis and through the axis of the channel parallel to the permanent bases, permanent river 30 meters wide, green, and channel width of 24 meters.
The local underground 1 layer, 4 floors, local 6 layers. Building height 20.70 m, 38.70 m partial to mark 70.00 meters high tower, decorated the dome of the central building of high 38.40 meters.
The project sub-basement floor north and south two: the northern bank and underground motor bike library and six of civil air defense shelter staff room, library and south of the motor power, power distribution room, and part of the bike; garage, air defense part of the story 3.60 meters, power room-storey 7.20 m, 6.00 m of distribution story.
The first floor divided North and South, in three parts: the northern part of the company's administrative and technical support to the entrance the entrance, reception of foreign R & D centers, sales, display some so-storey 5.4 meters. Central to the water garden and landscape. The southern entrance to the factory administration and staff entrance, kitchen, floors 5.4 meters. Southeast of the factory purchase, loading area. Workshop, warehouse part of the so-storey 6.90 m.
Layer mainly of two parts: the northern R & D centers, technical support, training part of the south for workshop, warehouse and staff restaurant. Middle Eastern connectors for technical support. Factory floor and warehouse district storey 6.00 m 4.50 m the rest of story. South Division