武定府釀造有限責(zé)任公司住宅樓施工組織設(shè)計.doc
進入下載頁
目 錄
一、工程概況
二、施工準(zhǔn)備
三、施工方案
四、施工現(xiàn)場平面布置
五、主要勞動力、材料、施工機具安排
六、施工組織計劃
七、主要分部、分項工程的技術(shù)措施及施工方法
八、質(zhì)量保證措施
九、質(zhì)量通病防治措施
十、安全生產(chǎn)措施
十一、夏、雨季、農(nóng)忙季節(jié)、冬季施工措施
十二、施工技術(shù)措施
十三、工期保證措施
十四、文明施工方案
十五、新技術(shù)、新工藝的采用及合理化建議
十六、工程技術(shù)資料管理與技術(shù)計劃
十七、降低成本措施
十八、保修期及保修措施
十九、工程施工平面圖
二十、工程施工網(wǎng)絡(luò)圖
一、工程概況
*********住宅樓工程,結(jié)構(gòu)類型為砌體結(jié)構(gòu),基礎(chǔ)形式為漿噴樁復(fù)合地基,建筑面積2997.92m2,東西長42.5m,南北寬13.60m,六層,建筑高度18.4m,由山東省惠民建筑設(shè)計院設(shè)計,位于*********有限責(zé)任公司院內(nèi)。
本工程五個單元,四種戶型,一層層高3.3m,二—五層層高為3.2m,尖頂層高2.7m。室內(nèi)外高差0.30m。門采用防盜門、鋁合金門連窗和夾
CONTENTS
First, project survey
Second, construction preparation
Third, the construction program
Fourth, the construction site layout
5, the main labor, materials, construction equipment arrangements
6, construction plans
7, the main branches, sub-projects of the technical measures and construction methods
8, quality assurance measures
9, quality defects prevention
10, safety measures
11, summer, rainy season, the busy season, winter construction measures
12, Construction Technology
13, schedule assurance measures
14, civilization construction plan
15, new technology and new technology adoption and rationalization proposals
16, engineering information management and technology program
17, cost-cutting measures
18, warranty and guarantee measures
19, engineering construction plan
20, construction network plan
First, project survey
********* Residential building construction, structural type of masonry structure, form the basis for the plasma jet piles, construction area 2997.92m2, from east to west 42.5m, north-south width of 13.60m, six-story building height of 18.4 m, by the Shandong Huimin Architectural Design Institute, a limited liability company located ********* hospital.
The works of five units, four-family, floor-storey 3.3m, two - five-storey to 3.2m, spire-storey 2.7m. Indoor and outdoor elevation 0.30m. Doors with security doors, aluminum doors with windows and folders
