1、施工組織設計
1.1項目管理網絡
1.1.1文明、園丁、油建、紅山、紅旗、西北、曙光、教育、西北、朝陽、紅波新村12棟住宅樓抗震加固工程若我公司有幸中標,將作為我公司重點工程,并選派具有類似工程施工經驗的優秀施工管理人員組成住宅樓抗震加固工程項目經理部。
工程將按項目法施工,實行項目經理負責制,以項目合同和成本控制為主要內容,以科學系統管理和先進技術為手段,行使計劃、組織、指揮、協調、控制、監督六項基本職能。項目經理部嚴格按照以GB/T9001模式標準建立的體系來運作,形成以全面質量管理為中心環節,以專業管理和計算機輔助管理相結合的科學化管理體制,實現對現場質量、安全、文明施工的總管理,工程進度、材料設備進出場和施工搭接的總控制。同時,本著科學管理、優質高速、開拓敬業的原則,以塑造精品為目標,發揮企業優勢,確保本工程實現一流的承包管理、一流的文明施工、一流的工程質量和一流的施工速度。
項目組織保證體系與職能圖如下
1, Construction Design
1.1 Project Management Network
1.1.1 civilization, gardener, oil and construction, Red Hill, Red Flag, North West, dawn, education, northwest, sun, red wave Village 12 Residential Building seismic retrofit project if I were fortunate enough to win the bid will serve as our key projects, and selected experience with similar construction composed of fine residential building construction management project manager for the Department of seismic reinforcement.
Project will be project construction, the implementation of the project manager responsibility system, project contracts and cost control as the main content, system management and advanced scientific technology as a means to exercise planning, organizing, directing, coordination, control, supervision of six basic functions. Department project manager in strict accordance with standards established by GB/T9001 model system to operate, the formation to total quality management as the central link to professional management and computer-aided management of the combination of scientific administration system on-site quality, safety and civilized construction general management, engineering progress, materials, appearance and construction equipment into the lap of the total control. Meanwhile, the spirit of scientific management, high quality, develop the principle of dedication to create excellent as the goal, to play a business advantage, to ensure that the project achieved first-class contract management, first-class civil construction, first-class quality and first class engineering construction speed.
Assurance system and the functions of the project organization chart is as follows