        泰達市民文化廣場主體工程施組.doc

        更新時間: 2024-02-18
        下載權限: 免費會員
        文件大小: 1.53 MB
        文件類型: .doc
        瀏覽次數:
        上傳會員: lajks
        所屬欄目: 施工組織設計
        進入下載頁
        資料簡介

        表 1 施工組織設計文字說明
        第一章 綜合說明···············1-16
        1 施工技術能力
        2 編制說明····························2-4
        3 工程概況························5-12
        4 施工部署·····························13-16
        第二章 設備、人員動員周期和設備、人員、材料運到施工場地的方法·····17-20
        1 機械設備進場計劃····················17-18
        2 勞動力計劃··························18-19
        3 材料進場計劃···························19-20
        第三章 主要工程項目施工方法及質量保證措施········21-77
        1 測量方案·······························21-23
        2 基礎工程、觀光通道工程施工方案及質量保證措施········24-35
        3 基礎排水和防止沉降措施···················36
        4 地下管線、地上設施、周圍建筑保護措施·······37
        5 主體結構主要施工方法及質量保證措施··········38
        6 裝修工程施工方案·····················58-59
        7 防水工程施工方案·······················60-64
        8 各種管道、線路等非主體結構工程施工方法及質量保證措施·······65-75
        9 采用新技術、新工藝、新材料及專利技術········76-77
        第四章 管理辦法及措施·······················78
        1 施工進度保證措施····················78-111
        2 冬雨期施工措施·····················79-83
        3 施工工序協調措施····················84
        4 工程項目管理辦法及體系框圖·········85-88
        5 保證安全施工措施及體系框圖·············89
        6 保證工程質量管理措施及體系框圖·····90-100
        7 現場文明施工措施·················101
        8 施工現場環保措施·····················102-103
        9 施工現場維護措施·······················104
        10 總包管理及服務措施························105-107
        11 工程交工后服務措施·························108-111
        表2 施工總平面布置圖·················112
        表3 主要分項工程施工工藝框圖···············112
        表4 施工進度計劃·······················112
        建虎網 http://www.ad176.com

        泰達市民文化廣場工程施工組織設計(投標)
        版權所有 不得進行刻錄和網絡上傳 2
        表1·施工組織設計文字說明
        第1 章:綜合說明
        1. 施工技術能力

        Table 1 shows the construction organization design language
        Consolidated statement of Chapter 1-16
        1 Construction of technical capacity
        2 shows the preparation of 2-4
        3 Project Overview 5-12
        4 Construction of the deployment of 13-16
        Chapter II equipment, personnel and equipment mobilization period, personnel, materials, methods of transportation to the construction site for 17-20
        A mechanical device approach plan 17-18
        2 Labor plans 18-19
        3 material approach plan 19-20
        The third chapter, the project construction methods and quality assurance measures 21-77
        A measurement program 21-23
        2, engineering, tourism channel construction program and quality assurance measures 24-35
        3 foundation drainage and to prevent the settlement of measures 36
        4 underground pipelines, ground facilities around the construction of 37 measures of protection
        5 of the main structure of the main construction methods and quality assurance measures 38
        6, renovation construction schemes 58-59
        7 waterproof construction program 60-64
        8 various channels, the main structural lines and other non-construction methods and quality assurance measures 65-75
        9 adoption of new technologies, new processes, new materials and patented technology 76-77
        Management methods and measures of Chapter 78
        A construction schedule to ensure measures 78-111
        2 winter rain on the construction of measures 79-83
        Construction process coordination measures 84 3
        4 project management approach and system block diagram of 85-88
        5 measures to ensure safety and system construction diagram 89
        6 to ensure project quality management practices and system diagram of 90-100
        Civilized construction site measures 7 101
        8 construction site environmental protection measures 102-103
        Construction site maintenance measures 9 104
        10 Total Package management and service practices 105-107
        Handing Over 11 works after the service measures 108-111
        Table 2 The total construction floor plan 112
        Table 3 Construction Technology major sub-diagram 112
        Table 4 Construction Schedule 112
        Jian Hu network http://www.ad176.com

        Cultural Square TEDA public construction organization design (bidding)
        Copyright shall not conduct burning and network upload 2
        Table 1 shows the construction organization design language
        Chapter 1: General Description
        1. Construction of technical capacity