薈芳園裙樓外立面改造工程外墻腳手架施工組織設計.doc
進入下載頁
目 錄
第一節 工程概況與編制依據 3
一、 工程概況 3
二、編制依據與參考書籍 3
第二節、施工準備工作及主要材料需用量計劃 3
一、技術準備工作 3
二、物質準備工作 4
三、勞動力準備 4
第三節、一般規定 5
第四節 外墻腳手架搭設有關要求 6
一、搭設范圍 6
二、有關要求 6
第五節 落地式雙排鋼管外腳手架搭設標準 7
一、腳手架材質 7
二、腳手架的基底 7
三、腳手架的掃地桿 8
四、架體與建筑物的拉結 9
五、腳手架板的鋪設 12
六、立桿的縱距、橫距、步距 13
七、外腳手架的防護 14
八、支撐體系 14
九、桿件搭設構造要求 18
十、荷載 19
十一、特殊部位處理 20
十二、搭設和拆除順序 24
十三、搭設驗收 、使用及管理 25
第六節 腳手架的結構 26
一、落地外腳手架 26
第七節、各項技術管理措施 27
一、腳手架材料質量控制措施 27
二、保證施工質量措施 27
三、保證施工安全措施 31
四、環境保護及文明施工措施 32
第八節、現場施工管理組織機構 33
一、安全生產管理目標 33
二、施工組織機構 34
2009-10/薈芳園裙樓外立面改造工程外墻腳手架施工組織設計.rar
CONTENTS
Survey and preparation of project based Section 3
First, project survey 3
Second, the preparation of the basis and reference books 3
Section II, the construction preparation work and the major amount of material required to plan 3
1, 3 technical preparations
Second, material preparation 4
Third, the labor to prepare 4
Section III, General Provisions 5
IV wall Scaffolding requirements 6
1, consists of placing the scope of 6
Second, the requirements 6
V floor double steel outer Scaffolding Standard 7
First, scaffolding material 7
Second, the scaffolding base 7
Third, scaffolding sweep shot 8
4, frame body and a building Rachel 9
5, scaffold boards laid on 12
6, pole of the vertical distance, horizontal distance, Step 13
7, 14, outside the protective scaffolding
8, support system 14
9, pole erection construction requirements of 18
10, load 19
11, a special area for 20
12, erection and dismantling of the order of 24
13, erection acceptance, use and management of 25
Section VI scaffolding structure 26
1, floor 26 outside the scaffold
Section VII, the technical management of 27
First, scaffolding materials, quality control measures 27
Second, ensure quality measures 27
Third, ensure safety measures 31 Construction
Fourth, environmental protection and construction measures 32 civilizations
Section VIII, on-site construction management organization 33
1, Safety management objectives of 33
Second, the construction of 34 organizations