工程變更、簽證管理辦法
為了明確承包人和發(fā)包人雙方的權益,減少施工、結算中因變更、簽證不規(guī)范引起的糾紛和爭議,特制定如下管理辦法共同執(zhí)行:
一、設計變更、現(xiàn)場簽證的確認:
設計變更、現(xiàn)場簽證是施工圖紙的補充部分,與正式施工圖紙一樣具有同等的法律效力,設計變更、現(xiàn)場簽證一經確認,發(fā)包人和承包人雙方必須按規(guī)定嚴格執(zhí)行。
1、設計變更的確認:施工中,發(fā)包人需對原工程設計進行變更,其設計變更必須由設計院簽發(fā),格式執(zhí)行建委規(guī)定的表格。
2、現(xiàn)場簽證的確認:施工中承包人不得對原設計進行變更。由于圖紙錯誤或工藝、標準等原因引起的變更,應由承包人根據(jù)現(xiàn)場的實際情況填寫現(xiàn)場簽證單,簽字蓋章后交監(jiān)理公司,由監(jiān)理工程師、甲方專業(yè)工程師簽字確認后生效。手續(xù)不全者則視為無效簽證。
3、施工中的隱蔽工程驗收證明、施工會議記錄、紀要、施工日志等均不能作為變更、簽證的依據(jù),更不能作為工程結算的依據(jù)。
二、執(zhí)行變更、簽證的程序和責任:
1、承包人在接到被確認的變更、簽證后應根據(jù)變更、簽證的具體要求執(zhí)行。
2、承包人在施工過程中執(zhí)行經確認后的變更、簽證而導致合同價款的變更及造成承包人的損失由發(fā)包人承擔,延誤的工期相應順延。
3、因承包人擅自變更設計發(fā)生的費用和由此導致發(fā)包人的直接
Engineering change, Visa Regulations
In order to clarify both the contractor and the contracting human rights, reducing construction and settlement due to changes in the visa irregularities caused by disputes and controversy is formulated as the joint implementation of management practices:
First, design changes, on-site confirmation of visa:
Design changes, on-site visa is a complementary part of the construction drawings, construction drawings and formal and have the same legal effect, design changes, the scene of a confirmed visa, contracting and contractor 雙方 date must be strictly Zhi Xing.
1, designed to confirm the change: construction, the developer is required to make changes to the original engineering design, design changes must be issued by the institute, the format form the implementation of the provisions of the Construction Commission.
2, on-site confirmation of visa: the construction contractor may not change the original design. As the drawing errors or process changes and other reasons caused by, the contractor shall fill out the actual situation according to the site of the single-site visa, signed and sealed by the Commissioner after the company submitted by the supervising engineer, Party A professional engineer sign it into effect. Incomplete procedures are regarded as invalid visa.
3, the construction of the hidden works acceptance certificate, construction meeting minutes, minutes, construction can not be the change log Deng Jun, a basis for visa, nor serve as a basis for settlement construction.
Second, the implementation of change, visa procedures and responsibilities:
1, the contractor identified in the receipt of the change, the visas should be based on changes in the implementation of the specific requirements of the visa.
2, the contractor in the construction process, confirmed after the implementation of changes to the visa changes caused by the contract price and the losses caused by the bidding contractor shall bear the delay of the construction period will be correspondingly extended.
3, due to unauthorized changes to the design contractor for costs incurred and the resulting direct contracting people