        一;工程概況
        1.2.2 地理位置和現場情況
        工程位于上海閔行區莘莊工業區華寧路以西、橫沙河以北地塊,基地東側為華寧路,南側為正在施工的規劃主路一,預計年底建成。基地北面為 NEC廠房。現場地勢平坦。自然地面平均標高約為4.50m。
        目前出入廠區有兩條道路。一條是沿華寧路(雙向四車道)、聯農路(6米水泥路)進入廠區東南角。另一條是沿華寧路、上廣電NEC南側圍墻市政路進入廠區東北角并與廠區北側道路銜接,目前正在進行市政道路施工,預計在8月底可以具備通車條件,現階段進出施工現場的道路為聯農路/華寧路,在臨時用電方面,已有兩路臨時供電線路接到施工現場,施工和生活用水有兩路,一路由廠區北側上廣電NEC接入,管徑為Ø50mm,另一路由東南側民房接入,管徑為40mm, 目前本工程三通一平已經完成,已具備開工條件。
        1.2.3 工程施工單位概況
        本工程共有4個單體組成,分別為:1工區、2工區、3工區。三個灌注樁基礎施工組,一個橋梁施工組。
        二;臨時排水方案
        2.1防止水污染措施
        1; Project Overview
        1.2.2 Location and site conditions
        Project is located in Minhang District, Shanghai Xin Zhuang Industrial Zone, west of Hua Ning, Wang Sha block north of the base east of the Hua Ning Road, south of the planning for the construction of the main road is one end of the year is expected to be completed. NEC plant north base. The scene is flat. The average natural ground level is about 4.50m.
        Currently there are two roads out of the factory. Hua Ning Road along a (two-way four lanes), United Agricultural Road (6 meters concrete road) into the southeast corner of the factory. The other is along the Chinese Ning, SVA NEC Municipal Road south wall into the factory and the northeast corner of the north side of the road link with the plant, municipal road construction now under way, expected to open to traffic by the end of August to have the condition, at this stage and out of construction site road for the United Agricultural Road / Hua Ning Road, in the temporary power consumption, has received a two-way temporary power line construction site, construction and household use, two way, all the way from the factory north of SVA NEC access, diameter To Ø50mm, another access route southeast of houses, diameter of 40mm, the current leveling of the project has been completed and the conditions already have started.
        1.2.3 Overview of Construction
        This works in the four monomers, namely: a work area, work area 2, 3 work area. 3 Pile Foundation Construction Group, a group of bridge construction.
        2; temporary drainage scheme
        2.1 Measures to prevent water pollution
         