          后澆帶施工方案
         
        在建筑工程中,通過設(shè)置后澆帶來解決設(shè)計中考慮沉降差異或鋼筋混凝土的收縮變形以及混凝土的溫度應(yīng)力等問題已廣泛應(yīng)用。后澆帶施工是保證結(jié)構(gòu)有效連接的重要環(huán)節(jié)。我司在施工石獅服裝批發(fā)城(一期)工程中,重視后澆帶各工序的施工質(zhì)量,確保后澆帶滿足設(shè)計意圖,從而起到它應(yīng)有的作用。
            石獅服裝批發(fā)城(一期)工程為地下1層、地上4層的框剪結(jié)構(gòu),其平面尺寸196m×66m。由縱向4道、橫向1道1000mm寬后澆帶將整個平面劃分為10個施工段。后澆帶長達460m。
        1.后澆帶的留設(shè)及支模
        1.1  地下室底板、外墻后澆帶
        地下室后澆帶施工中,底板、外墻后澆帶防水是兩個值得注意的問題。本工程地下水位-4.70~-4.50m,底板底標高為-4.60m,根據(jù)作業(yè)方案,人工挖孔樁施工階段采用的深井降水措施,在墊層施工后停止。為防止地下水產(chǎn)生突涌,采用對底板后澆帶處混凝土墊層施工進行加厚、提高混凝土強度等級,局部配筋等措施(見圖1)。
        Construction program after pouring
         
        In construction work, poured through the set to bring the design to consider the settlement to resolve differences or reinforced concrete shrinkage strain and thermal stress of concrete problems have been widely used. Poured band structure of the construction is to ensure that an important part of effective connectivity. Our wholesale clothes in construction Shishi City (1) project, attach importance to the process after pouring construction quality, ensure that back strip to meet the design intent, to play its proper role.
            Shishi clothing wholesale City (1) works for the underground 1 floor, 4 floors of the wall structure, the plane size of 196m × 66m. 4 by the vertical and horizontal one 1000mm wide plane after pouring into the whole construction of section 10. After pouring over 460m.
        1. The remained after the pouring and formwork
        1.1 The basement floor, wall, after pouring
        After pouring the basement construction, floor, wall poured with water are two notable problems. The project groundwater -4.70 ~-4.50m, the bottom floor elevation of-4.60m, according to work programs, manual digging deep pile used in the construction phase precipitation measures to cushion after construction stopped. To prevent ground water heaving on the floor with poured concrete liner construction with Department for thickening, increased concrete strength, reinforcement and other local measures (see Figure 1).
         