一、 塔機方案編制依據(jù)
電業(yè)局項目部塔機方案編制主要是根具以下幾點:
1. 電業(yè)局2號層住宅施工組織設(shè)計
2. 施工圖紙及現(xiàn)場地質(zhì)情況
3. QT80A塔式起重要說明書P31 46。
二、 工程概況及現(xiàn)場情況
邯鄣供電公司高層點式2號住宅樓,位叢臺東路供局新廠區(qū)家屬院內(nèi)。地
Han Zhang Municipal Electric Power Bureau 2 # high-rise residential buildings
QT80A Tower Crane Installation
Construction Unit: Coal Jian 第六 19
First, programming based on tower crane
Ministry of Electric Power Industry Bureau projects the main programming tower is the root with the following:
1. Electric Power Industry Bureau on the 2nd floor of residential construction organization design
2. Construction drawings and site geological conditions
3. QT80A tower an important statement P31 46.
Second, project profiles and site conditions
Han Zhang power company executives point-2 residential buildings, located Congtai East for the Council within the new factory Shizhi Relative'S Courtyard. Land