幕墻工程作業(yè)指導(dǎo)書.doc
進(jìn)入下載頁資料簡介
作業(yè)指導(dǎo)書
作業(yè)工序:施工前準(zhǔn)備 作業(yè)工序號:NO—01
一.說明
工程項目經(jīng)理要求對工程的工期進(jìn)度、技術(shù)資料、工具、器具、材料、人員、機械、臨時設(shè)施做好充分的準(zhǔn)備。
二.施工前準(zhǔn)備的內(nèi)容范圍
1.工程概況:對工地概況進(jìn)行了解掌握,熟悉有
Operating Instructions
Operating procedures: preparation work before construction work number: NO-01
1. Explain
Project Manager required duration of the project progress, technical information, tools, equipment, materials, personnel, machinery, temporary facilities, fully prepared.
2. Preparing for the contents of the scope of construction
1. Project Overview: To understand the profile of the site are familiar with
下載地址
