擠塑聚苯乙烯泡沫板外墻保溫施工方案.doc
進入下載頁
目 錄
1 工程概況···············1
2 材料組成················1
3 施工要求及條件·······1
4 施工工具···············2
5 工藝流程·············2
5.1 基層清理···············2
5.2 配制砂漿··············3
5.3 刷專用界面劑一道··········3
5.4 預粘板端翻包網(wǎng)格布············3
5.5 粘貼擠塑板···········3
5.6 安裝固定件···········6
5.7 打底···············8
5.8 滴水槽·············8
5.9 設(shè)置伸縮縫··········9
5.10 涂刷專用界面劑········9
5.11 抹第一遍面層聚合物抗裂砂漿·········9
5.12 埋貼網(wǎng)格布············9
5.13 抹面層聚合物抗裂砂漿···········11
6 細部及特殊部位做法·········14
7 安全措施·········16
8 文明施工及成品保護······17
9 成本降低措施········17
10 環(huán)境保護措施········18
CONTENTS
1 Project Overview 1
Material Composition 1 2
3 requirements and conditions of a construction
Construction Tools 4 2
5 Process 2
5.1 Primary cleaning 2
5.2 Preparation of Mortar 3
5.3 Brush a 3-specific surfactant
5.4 Pre-sticky side turning bag Mesh 3
5.5 paste extruded sheet 3
5.6 mounting pieces 6
5.7 bottoming 8
5.8 8 drop tank
5.9 Expansion Joint 9
Special brushing interface agent 5.10 9
5.11 wipe first pass crack surface polymer mortar 9
5.12 Mesh buried Posts 9
5.13 wipe surface polymer mortar cracking 11
6 detail and special part of the practice of 14
7 security 16
Protection of civil construction and finished 8 of 17
Cost reduction measures 9 17
18 of 10 environmental protection measures