塔 基 處 理 方 案
一、 施工準備:
1、 土:優(yōu)先采用基槽中挖出的土,但不得含有有機雜物,使用前應先過篩,其粒徑不大于20mm。含水量應符合規(guī)定。
2、 石灰:選用生石灰粉。
3、 主要機具:應用木夯、蛙式打夯機、手推車、篩子(孔徑(20mm)鐵鍬等。
二、 作業(yè)條件:
Square tower base case handling
First, construction preparation:
1, soil: given priority based slot dug soil, but may not contain organic debris, the use should be preceded by screening, the size of not more than 20mm. Water content should be specified.
2, lime: quicklime powder used.
3, the main equipment: The wooden ram, breaststroke tamping machine, trolley, sieve (aperture (20mm) shovel so.
Second, the operating conditions: