青島帆船中心陸域工程Ⅱ標段模板工程施工方案(地下).doc
進入下載頁
目 次
1. 工程概況……………………………………………………………………………………2
1.1 建筑及結構特點
1.2 方案選擇
2. 施工程序……………………………………………………………………………………2
2.1 施工順序
2.2 施工工藝流程
3. 施工方法……………………………………………………………………………………3
3.1 底板墊層模板支設
3.2 外墻第一道施工縫以下模板支設
3.3 底板上反梁模板支設
3.4 柱模板支設支設
3.5 剪力墻模板支設
3.6 樓板、梁模板支設
3.7 電梯井壁模板支設
3.8 樓梯模板支設
3.9 后澆帶模板支設
3.10有防水要求的墻柱對拉螺栓特殊說明
3.11 模板拆除
4. 主要資源需求………………………………………………………………………………11
4.1 勞動力需求計劃
4.2 主要周轉材料需求計劃
5. 施工要求及保證措施………………………………………………………………………12
5.1 施工要求
5.2 施工控制要點及技術措施
5.3 組織及管理措施
5.4 安全技術措施
6. 編制依據……………………………………………………………………………………15
附:模板計算書
CONTENTS
1. Project Overview ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 2
1.1 Building and structural characteristics
1.2 Selection
2. The construction procedure ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 2
2.1 Construction Sequence
2.2 Construction Process
3. Construction methods ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 3
3.1 Template support floor cushion set
3.2 The external walls of the first set construction joints support the following template
3.3 floor on the anti-Beam design template support
3.4 column template set support based Support
Shear wall design template support 3.5
3.6 slabs, beams set the template support
3.7 elevator shaft design template support
3.8 stairs design template support
3.9 branch back strip template set
3.10 waterproof requirements Qiang Zhu and bolt the special instructions
3.11 template removal
4. The main resource requirements ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 11
4.1 The demand for labor programs
4.2 The main working material requirements planning
5. The construction requirements and ensure that measures ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 12
5.1 Construction requirements
5.2 Construction of control points and the technical measures
5.3 Organization and management
5.4 Safety Measures
6. Preparation according to ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 15
Appendix: Template calculations