中科院青年小區10#、11#樓回填土施工方案.doc
進入下載頁
一、工程概況
中科院中關村10 號樓基礎埋深標高-12.01m,CFG 復合樁地基,基礎
開挖采用土釘墻邊坡支護方式,基礎底板1.6m 厚,底板外模采用磚砌胎膜,
地下結構底板下及外墻外鋪貼兩層SBS 防水卷材。
本工程基礎底板防水施工后,進行底板胎膜外的2︰8 灰土回填,地
下基礎結構施工到±0.00 后,進行地下室肥槽回填。按照設計圖紙要求,2
︰8 灰土回填坡度1:0.25,沿建筑物外墻下,底部寬度50cm,上部寬度為
3.35m 范圍內填2:8 灰土,其余均以素土回填。
填土壓實系數設計無具體要求,按照常規要求一般為0.93~0.95,夯實
后的干密度≥1.45g/cm3。本工程回填土質量控制指標選用干密度。
本工程基坑回填土總量:灰土約2488m3,素土約650m3。回填土
First, project survey
Chinese Academy of Sciences 10 Zhongguancun Building depth of foundation elevation-12.01m, CFG composite pile foundation, foundation
Excavation of a soil nail wall slope protection method of the base 1.6m thick, with brick floor outside the model membranes,
Under the underground structure and exterior floor tiling two SBS waterproofing membrane.
Waterproofing of the base of this project was conducted after the outer membranes of the two bottom ︰ 8 lime filling, land
Infrastructure under construction to ± 0.00 after the fertilizer tank for filling the basement. In accordance with the design drawings, 2
︰ 8 lime filling slope 1:0.25, along the building wall, the bottom width of 50cm, the upper width
3.35m range of 2:8 lime filling, and the remaining are prime soil backfill.
Fill compaction factor design has no specific requirements, in accordance with the general requirements generally 0.93 to 0.95, compaction
Of dry density ≥ 1.45g/cm3. The works selected backfill quality control index dry density.
The total amount of excavation backfill: lime about 2488m3, prime land of about 650m3. Backfill
